Min. Order: | 1 Set/Sets |
---|---|
Payment Terms: | T/T |
Supply Ability: | 100 sets/year |
Place of Origin: | Guangdong |
Location: | Guangzhou, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Brewing Equipment |
Means of Transport: | Ocean |
---|---|
Heating Source: | Steam |
Capacity: | Customized |
Electric Supply: | Customized |
Material: | Stainless Steel 304 |
Condition: | New |
Thickness: | 3mm |
Place of Origin: | 12 months |
Payment: | T/T |
MOQ: | 1 set |
Production Capacity: | 100 sets/year |
Packing: | frame and film, fixed with belt |
Delivery Date: | 90 days |
Mash Kettle Tun Brew House
Description:
Steam heated brew house
The working platform combines two tanks
Capacity can be customized according to individual request
With jacket
Material of this brew house is stainless steel 304
Electric supply can be customized according to users' local electricity regulation
3mm thickness
Heating source can be steam, gas or electricity according to users' request
Well welded and polished, good for both use and view
Superior quality, good performance
Specifications:
Heating Source: steam, can be gas or electricity | Capacity: can be customized |
Electric Supply: can be customized | Material: stainless steel 304 |
Place of origin: Guangzhou | Thickness: 3mm |
Optional: condensing pipe, spindle station | Warranty: 12 months |
Delivery:
Typically it takes about 90 days to manufacture a brewhouse system, but depending on the size and the amount of customized equipments, the delivery date can be shorter or longer.
Packing:
We pack the equipments with protection film and frame, then tightly fixed with belts. It effectively prevents the equipments from any damage during the transportation from our factory to the destination.