Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,EXW |
Payment Terms: | T/T |
Supply Ability: | 100 sets/year |
Place of Origin: | Guangdong |
Location: | Guangzhou, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Brewing Equipment |
Means of Transport: | Ocean |
---|---|
Heating Source: | Steam |
Capacity: | 15 BBL |
Electric Supply: | 3 phrase/ 380V/ 50Hz |
Warranty: | 20 months |
Vessels: | Two |
Condition: | New |
Thickness: | 3mm |
Place of Origin: | Guangzhou |
Payment: | T/T |
Production Capacity: | 100 sets/year |
Packing: | frame and film, fixed with belt |
Delivery Date: | 90 days |
Two Vessel Brew House
Description:
Steam heated brewhouse system
This brewhous system contains a mash lauter tun and a kettle whirlpool tun
The working platform combines two tanks
This system adopts combi-tanks to save the space
With jacket
The whole plant are made of stainless steel 304
3 phrase/ 380V/ 50Hz or customized
3mm thickness
It is designed for small brewery
Specifications:
Heating Source: steam | Capacity: customized |
Electric Supply: 3 phrase/ 380V/ 50Hz or customized | Condition: New |
Optional: condensing pipe, spindle station | 12 months warranty |
Delivery:
Typically it takes about 90 days to manufacture a brew house system, but depending on the size and the amount of customized equipments, the delivery date can be shorter or longer.