Place of Origin: | Zhejiang |
---|
Location: | Shanghai, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | PPR Water Pipe, PPR Pipe Fitting, Electric Wires And Cables |
Model No.: | JDG series |
---|
Heavy Wall Conduit Schedule 40 Galvanized Steel Pipe ASTM / EN / DN / JIS Standard
We can supply 4000MM length JDG galvanized steel conduit pipes, and we provide OEM / ODM service with customized size.
Specification:
Product Name: |
BS /ASTM /EN /DN/JIS Galvanized Steel Pipe |
|
Size |
OD |
1/2-8" (20mm-355mm) |
Wall Thickness |
0.5mm-30mm SCH30,SCH40,STD,XS,SCH80,SCH160,XXS etc. |
|
Length |
Less than 12m |
|
Steel material |
Q195 → Grade B, SS330,SPHC, S185 Q215 → Grade C,CS Type B,SS330, SPHC Q235 → Grade D,SS400,S235JR,S235JO,S235J2 Q345 → SS500,ST52 |
|
Standard |
BS EN10296,BS EN10025,BS EN10297,BS6323, BSEN10219,BSEN10217,GB/T13793-1992,GB/T14291-2006 GB/T3091-1993,GB/T3092-1993,GB3640-88 |
|
Usage |
Used For Structure, Accessorize And Construction |
|
Ends |
1) Plain 2) Beveled 3) Thread with Coupling or cap |
|
End protector |
1) Plastic pipe cap 2) Iron protector |
|
Surface Treatment |
1) Bared 2) Black Painted (varnish coating) 3) Galvanized 4) With Oiled 5) 3 PE, FBE, corrosion resistant coating |
|
Technique |
Electronic Resistance Welded (ERW ) Electronic Fusion Welded (EFW) Double Submerged Arc Welded (DSAW) |
|
Type |
Welded Pipe |
|
Welded Line Type |
Longitudinal |
|
Section Shape |
Round |
Features:
1. Light weight:
To guarantee the strength condition of pipes, the pipe wall thickness is reduced, so that the construction of the pipe installation and handling more conveniently.
2. Low price:
The wall is composed of thin wall instead of thick wall, which can save many steel materials, and the prices per unit length of pipe is reduced, thereby reducing the project cost.
3. Convenient construction:
Tube set connection style to fresh is buckled and connected to replace the traditional threaded or welded construction, and there is no need to do cross connection, both to ensure that the tube wall has good conductivity, but also eliminates the need for a variety of construction equipment and construction links, simplifying the construction so as to improve the work efficiency. It speeds up the construction schedule and save the construction cost.
4. Construction more safety:
Pipe construction without welding equipment, construction site no open flame, to eliminate the hidden danger of fire, to ensure the safety of the construction of the construction site, withhold convenient,
to improve the firmness.
Application area:
1, residential, urban and rural water supply and drainage, hot and cold water piping system
2, city gas system
3, the power cable protection system
2, industrial water and chemical transport and exhaust system
3, pure water, drinking water pipes and pipe fittings
4, drink, medicine production delivery system
5, compressed air pipes, pipe fittings
6, other industry and agriculture, pipe fittings.