Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | FOB,CFR,CIF |
Payment Terms: | T/T, WU, Money Gram |
Supply Ability: | 15PCS/month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Service |
Model No.: | FF-S |
---|---|
Means of Transport: | Ocean, Air, Land |
Model: | FF-S |
fan motor: | 2.2kw |
Dimension(L*W*H): | 56cm*95cm*48cm |
extraction volume: | 4000Nm3/h |
working voltage: | 110v or 220v or 380v |
Inner size: | Inner size: 44cm*50cm*48cm or customized |
Material: | Steel / Galvanized/Stainless |
Machine Type: | Metal Coating Machinery |
warranty: | 1 year |
Certification: | CE |
Production Capacity: | 15PCS/month |
Packing: | wood case |
Delivery Date: | 5-10days |
FUNCTIONS
1. manual booths are the right solution for every application: for new start up and experienced users alike, or as a one-off solution for small or medium series.
2. A space-saving design,integrated functions and ease of operation provide ideal conditions for efficient and high quality manual coating.
3. by maintaining the airflow at design levels. During operation overspray powder accumulates on the cartridge filters. As the cartridge filters load, airflow decreases and negative pressure rises within the air handler. A timer activates a system of air purging valves that clear the cartridge filters of accumulated powder to ensure maximum life.
Installation
1,Make sure that the installation area has a level
2,make sure the booth grounded
3,connect to the air supply
Operation
Turn on
1. Turn on the poer,Press the turn on fan blue bottom.
2. turn on the powder coating gun, Start to spray.
3. after 30 mins powder coating, please press the pulse bottom to make the powder which attached onto the filter dropping.
Turn off
1. Turn off the fan ,clean up the powder which dropped into the booth
2. turn off the power..
MAINTENANCE
1. Clean up the powder in the hang often
2. clean the filter often.
Benefits of our powder booth
Operator Safety
Environmental compliance
Production capacity and operational efficiency
Color changeover
longer lasting, more durable, quieter
include fans, motors, nut and bolt fasteners, filters, detailed drawings and instructions, all included in one single shipment.
First Pre-sale services:
1). Select equipment model;
2). Design and manufacture according to client's special requirement.
3). Train technical personal for clients.
Second Services during the sale:
1). Pre-check and accept products ahead of delivery.
2). Help clients to draft solving plans.
Third After-sale service:
1). Assist clients to prepare for the first construction scheme.
2). Install and debug the equipment.
3). Train the first-line operators.
4). Examine the equipment.
5). Take initiative to eliminate the trouble rapidly.
6). Provide perfect service.
7). Provide technical exchanging.