user login

4 Shafts Adhesive Tape Slitting Rewinding Machine Roll Cutter Slitter 380V 50HZ

Place of Origin: Guangdong

Company Profile

Location: Dongguan, Guangdong, China (Mainland)
Business Type: Manufacturer
Main Products: BOPP Tape Cutting Machine

Product Detail

Model No.: AIA-1

Product Description

4 Shafts Adhesive Tape Slitting Rewinding Machine Roll Cutter Slitter 380V 50HZ

 

 

Specifications:

 

Material BOPP Adhesive Tape, BOPP Packing Tape
Voltage(V/Hz) 3Phase 380V 50HZ
Effective work width 1300mm/ 1600mm
Max. unwinding diameter 800mm 
Max. rewinding diameter 150mm (for 4shafts)
Inner diameter of core 76.2mm
Min. slitting width 12mm (please confirm)
Max. Machine Speed

0~180m/Min

(To adjust speed according to different materials)

 

 

Feature

 

1. Full-automatic four-shaft exchange is adopted and the efficiency is improved.

2. Stepless speed regulation of frequency conversion and three-step length setting provide smooth 

    rewinding operation to ensure accurate rewinding length. It can automatically decelerate and stall when 

    operating at high speed.

3. The unwinding tension is adopted with pneumatic braking control. The rewinding tension is adopted 

     with the dual control equipped with the clutch and the independent slide setting for free adjustment of 

     the tensile force.

4. The curved stretch roller is designed to eliminate tape wrinkling during extension and feeding. 

5. Pneumatic brake brings the machine to an immediate halt for accurate positioning and labeling.

6. (Optional) Auto labeling and slitting stationery tape functions.

 

 

Applications:

 

Suitable for dividing of all kinds of auto-adhesive glue tape.

equipped with air pressure wheels to decrease the noisy of semi-products peeling.

Besides, the "extend wheel" can avoid crinkling,owning the beautiful appearance.

 

 

Commercial Terms

 

(1) Delivery time:Within 25 days after 30% advance payments by T/T

(2) Delivery method:Partial with Wooden package or as your  requirements

(3) Payment term:Take 30% of the total price as advance payment by 

     T/T and the balance should be paid off before delivery.

(4) Installation:The seller is responsible for installation and debugging.The whole installation,debugging 

     and training will take about 3-5 days, and the seller will send professional engineers to install, and the 

     installation fee is 60USD/day/person.The buyer is responsible for the round-trip.

(5) Guarantee:The seller is responsible for changing the parts which have quality problem of the 

      machines in one year, except for the wearing parts and the quality were caused by wrong operation 

      and other man-made factors,and the quality problem should be confirmed by two sides.

 

 <

Post Buying Request