user login

Shantui Bulldozer Differential Pressure Sensor For wide application testing pressure

Place of Origin: Guangdong

Company Profile

Location: Xuzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer
Main Products: XCMG Spare Parts, CAT Spare Parts, Komatsu Spare Parts

Product Detail

Model No.: AIA-1

Product Description

Shantui Bulldozer Differential Pressure Sensor For wide application testing pressure

 

 

Shantui Bulldozer SD22 Pressure Sensor / Pressure Transducer 23Y-07D-00009/Bulldozer Parts/Shantui Bulldozer Parts

1. Updated product design

2. Optimized materials selection

3. Advanced manifacturing process and production technology

4. All are in the line with global standards

5. By long time testing, proved to be excellent

 

1

 Bulldozer series

SD13,SD16,SD22,SD23,SD32,SD42…

2

 Bulldozer series

D60.D85.D155.D275.D355…,D6D,D7G…

Ranges:

To assure it is the exact part you demand, pls advise your machine brand & model, or offer

 the Part NO. Thank you!

Mainly parts: Cab, filter, radiator, hydraulic radiator, boom cylinder, arm cylinder, bucket  cylinder, blade lift oil cylinder, tilt cylinder, water pump, fuel pump, steering pump, work pump, main

 pump, oil pump, transmission pump, fuel injector, final drive ass’y, travel  motor ass’y, starting motor ass’y, main valve, service valve, blade control valve, steering  valve, safety valve, transmission valve, solenoid valve, valves, pins, turbochargers,  monitor, CAB, link, bushing, plate, ring repair kit, bucket teeth, guard, shim, seal, pin,  cover, undercartridge spare parts: track roller, carrier roller, front idler, track link, track shoe, Excavator

 & Bulldozer spare part.

 

Packing methods:

 

Delivery:

-Q: How do deliver the goods?
 -A: by sea/by train/by air, we'll recommend the best way for you depends on goods quantity.

WEIGHT RECOMMENDED TRANSPORT MEANS TRANSPORT TIME COMMENTS
<50kg express-UPS/DHL/FEDEX
door to door service 3-7 days fast
convenient
expensive
50-150kg by air 3-10 days fast;
economic;
consignee has to do customs clearance
150>kg by sea 10-50 days slow;
economic;
it takes some time for customs declarance and clearance
2x20' or 1x40' by rail 20-35 days slow;
economic;
it takes some time for customs declarance and clearance;
only full container load accepted( MOQ:2x20' or 1x40' )

Post Buying Request