user login

SHANTUI Road Roller / Motor Grader Power Switch Parts For SR20M CE ISO

Place of Origin: Guangdong

Company Profile

Location: Xuzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer
Main Products: XCMG Spare Parts, CAT Spare Parts, Komatsu Spare Parts

Product Detail

Model No.: AIA-1

Product Description

SHANTUI Road Roller / Motor Grader Power Switch Parts For SR20M CE ISO

 

 

SHANTUI Road Roller Parts Power Switch D2602-05000 For SR20M Road Roller

 

Quick Details:

 

Part No.

D2602-05000

Name

power switch

MODEL

SR20

Weight

ABOUT 0.4kg

type

original or OEM

Warranty Time

Six Months

Certificate

CE, ISO

MOQ

1 pcs

MAX

10000

Delivery time

in stock

Package

standard export package: pallet, carton , wooden case or as requests.

 

Competitive SHANTUI Parts:

 

1. SHANTUI bulldozer excavator road roller motor grader wheel loader whole machines

2. Undercarriage Parts, track shoe ass’y, track link ass’y, front idler, track roller, carrier roller, sprocket.

3. Torque Converter Assembly and Transmission Assembly

4. End bit and cutting edge

5. Pump, valve and cylinder series

6. Engine parts (Camshaft, Crankshaft, Connecting Rod, Cylinder Liner, Piston, Piston Ring and Piston Pin.)

 

Advantages:

 

1: Genuine and original SHANTUI parts

2: Full series SHANTUI spare parts

3: Large stock in warehouse

4: Best competitive price 

5: Genuine SHANTUI package

6: Fast delivery time

 

Packaging & Shipping

 

Export standard Plywood box packing (water proof,damp proof and mould proof and fumigation-free).

 

 

About delivery

 

  1. International Express: Such as DHL, UPS, FEDEX and so on.
  2. Air transportation: For goods above 45KG, it is economic choice for customers.
  3. By sea: Heavy cargo by container transport

 

WEIGHT

RECOMMENDED TRANSPORT MEANS

TRANSPORT TIME

COMMENTS

<50kg

express-

3-7 days

fast

UPS/DHL/FEDEX

convenient

door to door service

expensive

50-150kg

by air

3-10 days

fast;

economic;

consignee has to do customs clearance

150>kg

by sea

10-50 days

slow;

economic;

it takes some time for customs declarance and clearance

2x20' or 1x40'

by rail

20-35 days

slow;

economic;

it takes some time for customs declarance and clearance;

only full container load

accepted( MOQ:2x20' or 1x40' )

 <

Post Buying Request