Place of Origin: | Guangdong |
---|
Location: | Xuzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | XCMG Spare Parts, CAT Spare Parts, Komatsu Spare Parts |
Model No.: | AIA-1 |
---|
Bulldozer Instrument VDO Replacement Parts for SHANTUI SD16 SD22 SD32
Shantui bulldozer spare parts/SHANTUI SD22 bulldozer parts,SHANTUI Bulldozer Parts SD22 chronometer D2170-00000
Brand Name: |
SHANTUI |
Model Number: |
D2170-00000 |
Certification: |
CE/ROHS/FCC/SGS/ISO9001 |
Place of Origin: |
CHINA |
Specifications:
1: Genuine and original SHANTUI Bulldozer parts
2: Full series SHANTUI Bulldozer parts
3: Large stock in warehouse SHANTUI Bulldozer parts
4: Best competitive price SHANTUI Bulldozer parts
5: Genuine SHANTUI Bulldozer parts package
6: Fast delivery time SHANTUI Bulldozer parts
7: Could change the material to control the cost as customer required SHANTUI Bulldozer
Ranges:
To assure it is the exact part you demand, pls advise your machine brand & model, or offer the
Part NO. Thank you!
Mainly parts: Cab, filter, radiator, hydraulic radiator, boom cylinder, arm cylinder, bucket cylinder, blade lift oil cylinder, tilt cylinder, water pump, fuel pump, steering pump, work pump, main pump,
oil pump, transmission pump, fuel injector, final drive ass’y, travel motor ass’y, starting motor ass’y, main valve, service valve, blade control valve, steering valve, safety valve, transmission valve, solenoid valve, valves, pins, turbochargers, monitor, CAB, link, bushing, plate, ring repair kit, bucket teeth, guard, shim, seal, pin, cover, undercartridge spare parts: track roller, carrier roller, front idler, track link, track shoe, Excavator
& Bulldozer spare part.
Packing methods:
Delivery:
-Q: How do deliver the goods?
-A: by sea/by train/by air, we'll recommend the best way for you depends on goods quantity.
WEIGHT RECOMMENDED TRANSPORT MEANS TRANSPORT TIME COMMENTS
<50kg express-UPS/DHL/FEDEX
door to door service 3-7 days fast
convenient
expensive
50-150kg by air 3-10 days fast;
economic;
consignee has to do customs clearance
150>kg by sea 10-50 days slow;
economic;
it takes some time for customs declarance and clearance
2x20' or 1x40' by rail 20-35 days slow;
economic;
it takes some time for customs declarance and clearance;
only full container load accepted( MOQ:2x20' or 1x40' )