user login

tray mould;tray plastic mould;double side tray mould;blow moulding pallet;Plastic pallets;Forklift pallet;Plastic tray

12000.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 600sets/year
Place of Origin: Zhejiang

Company Profile

Location: Taizhou, Zhejiang, China (Mainland)
Business Type: Manufacturer
Main Products: Plastic Mould

Product Detail

Model No.: DY-1007
Means of Transport: Ocean
Product: Others
Product Material: Plastic
Shaping Mode: Plastic Injection Mould
Brand Name: DY
Model No.: Taizhou Duoyuan Plastic Mould Co.,Ltd..: Production Capacity:600sets/year
Delivery Date:30 days for the first test: Product Material:Steel
Brand Name:DY: Delivery Date:30-60days
Equipments::CNC, Electric Spark Machine..:CNC Machining:0.003to 0.005...: Product:Place of Origin::Zhejiang,China..
Design Software::UG, PROE, Auto CAD, SolidWo..:: MOQ::1 Set
Means of Transport:Ocean,Land,Air: Packing:wooden case
Shaping Mode:Plastic Injection Mould: Product name: Popular air cooler
:Production Capacity:300sets...: Injection Mould:High classic very mature:Mould Steel::NAK80,2738,231...
Production Capacity: 600sets/year
Packing: wooden case
Delivery Date: 30-60 days
Show

Product Description

We are professional mould factory,we have already made plastic mould for more than 10 years. The pictures you see in our display is the real moulds and products we have made.All of them goes well.

Have you found the shape you are looking for? If yes,please tell me which model you are interested,and we can send you details for the model. If you didnot find what you need, donot worries, please send us your artwork or draft,we can send you more pictures for your selection. Sorry, we cannot put all the pictures in our display.

 

The following is some necessary information you may need:

Model No.: Taizhou Duoyuan Plastic Mould Co.,Ltd..

Production Capacity:600sets/year

Delivery Date:30-60days

Product Material:Steel

Brand Name:DY

Shaping Mode:::Plastic Injection Mould

features::plastic mould structure

Equipments::CNC, Electric Spark Machine...

CNC Machining:0.003to 0.005mm

Means of Transport:Ocean,Land,Air

Packing:wooden case

Product:Household Product

Shaping Mode:Plastic Injection Mould

Place of Origin::Zhejiang,China(Mainland)

Injection Mould:High classic very mature

.Mould Steel::NAK80,2738,2316,H13,718,S13...

Design Software::UG, PROE, Auto CAD, SolidWo...

MOQ::1 Set


Steel hardness: HRC28-56(according to different steel)
Tooling lead time: 30 days
Mould life: 1, 000, 000 times
Quality assurance: ISO9001Ensures you to us

  Steel hardness: HRC28-56(according to different steel)

Tooling lead time: 50 days
Mould life: 1, 000, 000 times
Quality assurance: ISO9001Ensures you to us

Quick Details

· Place of Origin:Zhejiang,China(Mainland)

· Brand Name:DY

· Model Number:DY-1007

· Shaping Mode:Plastic Injection Mould

· Product Material:Plastic

· Product:

· Condition:New

Packaging & Delivery

Packaging Details:

The packing as your requirement

Delivery Detail:

30 days after reciving 50% deposit

Specifications

1) Surface: MAT finish(textture) Economic Tooling cost
2)Mould life :500,000
3)Thickness:Can be varied if require

Mould Service

with high quality ,long life ,top technic design,   prompt delivery, excellent service ,reasonable price

Technology

adopt CAD/CAM/CAE to design and use advance machines to   insure the quality

Cavity quantity

single or multi cavity

Cavity /core material

45#, P20, 718,718H2311, 2738. NAK80,S136,H13 ,2344 Etc   according to clients requirement

Product material

 PP, PE, etc

mould cycle time

300,000 to1000,000 times

 

Machine:

Major equipment

Numbers (set)

     Testing Equipment

      CNC

    10

3D scanner

Number

(set)

   2

Year old

   3

Calibration Frequency

0.025

  mm

Brand

DY

 

   Balancing Machine

    1

    Wire-cutting

    8

   Grinding Machine

    2

   Drilling  Machine

    6



Business flow

1.Quote

According to sample, drawing and specific requirement.

          ↓

2.Discussion

Mold material, cavity number, price, runner, payment,   etc.

          ↓

3.S/C Signature

Approval for all the items

4. Advance

Pay 50% by T/T

          ↓

5.Product Design Checking

We check the product design. If some position is not   perfect, or can not be done on the mould, we will send customer the report.

          ↓                    

6.Mould Design

We make mould design on the basis of confirmed product   design, and send to customer for confirmation.

          ↓

7.Mold Tooling

We start to make mold after mold design confirmed

          ↓

8.Mold Processing

Send report to customer once each week

 

        ↓

10. Mold Modification

According to customer's feedback

↓ 


11.Balance settlement

50% by T/T after the customer approved the trial sample   and mould quality.

Mould process:

6.  Mould Maintenance

a) When the mould is vacant, spray the anti-rust oil

b) To clean the gate and cooling system regularly

c) Avoid to use recycled material if the mould is suitable for virgin material only

 

Our factory is located in Huangyan,Zhejiang province,China. We are near to railway station, bus station and air port,if you have got time, welcome to visit our factory. You will find our workers are professional and kindly, our machines are advance,our boss is very nice to customers,our workshop is well organized.

Multi-source mould comprehensive strength

Dimensions production base with a strong research and development, production team, many professional production lines, the delivery date is guaranteed;

Introduce advanced three dimensional inspection equipment, equipped with perfect quality control system;

Rich experience in injection molding to make our mould to make more reasonable and more efficient, greatly shorten the late production costs.

 

Any question is welcomed!

 

With our Best regards!

Taizhou Duoyuan Plastic Mould Co.,Ltd.

 

 

 

Post Buying Request