Place of Origin: | Guangdong |
---|
Location: | Wenzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Stainless Steel Seamless Pipe, Stainless Steel Seamless Tube, Heat Exchanger Tube |
Model No.: | AIA-1 |
---|
Galvanized Carbon Steel Butt Welding Pipe Fittings Elbow 180 Degree Return Bends
Specifications:
BUTT-WELDING PIPE FITTINGS DETAILS | ||
MATERIAL | Carbon Steel : | |
ASTM, A234WPB, A234WPC, A420WPL6 ,Q235,10#, A3, Q235A, 20G,16Mn, | ||
DIN St37, St45.8, St52.4,St.35.8,St.35.8. | ||
Stainless Steel: | ||
1Cr18Ni9Ti 0Cr18Ni9 00Cr19Ni10 0Cr17Ni12Mo2Ti | ||
00Cr17Ni14Mo2 304 304L 316 316L | ||
Alloy Steel: | ||
16Mn Cr5Mo 12Cr1MoV 10CrMo910 15CrMo 12Cr2Mo1, | ||
A335P22 St45.8, ASTM A860 WPHY X42 X52 X60 X70 | ||
STANDARD | ASTM / JIS / DIN / BS / GB/GOST | |
MODEL | 1.Tee(Straight and Reducing) 2.180 DEG Return | |
3.Elbow (45/90/180 DEG) 4.Cap | ||
5. Reducer(Concentric and Eccentric) | ||
TYPE | Seam Or Seamless | |
ELBOW DEGREE | 45 degree, 90 degree, 180 degree | |
SURFACE | Black Paint, Anti Rust Oil, Hot-Dipped Galvanized | |
WALL THICKNESS | SCH5S,SCH10S,SCH10,SCH20,SCH30,SCH40,STD,XS,SCH60, | |
SCH80,SCH100,SCH120,SCH140,SCH160,XXS,2MM | ||
SIZE | 1/2"-48"(Dn15-Dn1200) | |
CONNECTION | Welding | |
SHAPE | Equal, Reducing | |
CERTIFICATE | ISO9001 | |
APPLICATION | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc |
Description:
RELATED PRODUCTS | 1. Carbon steel nipples and sockets | |
2. Flanges | ||
3. Malleable iron pipe fittings | ||
4. Pipes | ||
5. High-pressure fittings | ||
6. Valves | ||
7. P.T.F.E .thread seal tape | ||
8. Brass fittings | ||
9. Ductile iron pipe fittings | ||
10. Copper fittings | ||
11. Sanitary fittings, etc,. | ||
12. Grooved fittings | ||
Customers’ drawings or designs are available. | ||
PACKAGE | 1> 1/2" - 2" in cartons. | |
2>Above 2" in wooden cases. | ||
Big size is workable by pallets. | ||
DELIVERY DETAILS | According to the quantities and specifications of each order. | |
Normal delivery time is from 30 to 45 days after receiving the deposit. |
Payment |
1. by TT 30% in advance or L/C at sight, the balance against copy of B/L. |
Delivery time |
A. 3 days if this goods is stock. B. 30 days if goods will be produced after order |
Price Validity |
Within 7 days |
Sample |
Is available by free, the express by buyer’s account |
Price Term |
FOB, CNF, CIF, FCA |
Applications:
Use for Oil, Gas, Sub-watering act
Competitive Advantage:
Our factory is near to raw material market and high-speed way, the producing cost is low.
Our factory have long history for producing carbon steel pipe fittings, ,both producing and testing machine
is advanced and perfect.
Our factory was certificated by BV/ISO/LR/RINA/CCS/GL/ABS/DNV, which can improve the quality.
We participated in many famous projects with our pipe fittings.
Carbon Steel Pipe Fittings