user login

Unisex Static dissipative ESD Professional Lab Coats for Cleanroom

Place of Origin: Guangdong

Company Profile

Location: Wuhan, Hubei, China (Mainland)
Business Type: Manufacturer
Main Products: Cleanroom Clothing, Cleanroom Jumpsuit, Professional Lab Coats

Product Detail

Model No.: AIA-1

Product Description

Manufacturer for Professional Lab Coats/ESD Lab Coat  for Cleanroom


Description

 

1. Static dissipative (ESD) smock for use in EPA (Electrostatic Discharge Protected Area) 

2. Unisex Design

3. Easy hidden zipper fastening 

4. surface resistance  Rs =10e6~10e9ohms

5. Available in all ESD woven fabric types

6. pockets & ESD logo available

7. Cap available.

8. Size  S, M, L, XL, 2XL  available

9. Clors:White,Blue,Pink,Yellow,Green and so on

10. Special design, sizes, colors and embroidery are available upon request , we also can use anti bacterial fabric to make the cleanroom coats.

 

  

Q1

How fast can I get the quotation?

A

We usually make an offer within 1 hour after we get your inquiry. It takes 9 hours if your

 inquiry hit our email at our free time. 

Q2

How can I get a sample to check your quality?

A

After price confirmation, you can require for samples to check our quality. 

 

If our samples can not be provided free, we will charge for the sample cost..But the sample

 cost can be refundable after order 

confirmation when your quantity of the order is more than the MOQ.

Q3

What about the leadtime of sample?

A

It takes 2-3 days after your samples confirmation

Q4

Can you do the design for us?

A

Yes. We have a professional team having rich experience in designing and manufacturing. Just tell us your ideas and we will help to carry out your ideas into perfect fact. It does not matter if you do not have someone to complete files. Send us high resolution images, your Logo and text and tell us how you would like to arrange them. We will send you finished files for confirmation.

Q5

What about the lead time for mass production?

A

Honestly, it depends on the order quantity and the season you place the order. The lead time of 500pcs is about 8 working days. Generally speaking, we suggest that you start inquiry two months before the date you would like to get the products at your country.

Q6

What is your terms of delivery?

A

We accept EXW, FOB, CIF, etc. You can choose the one which is the most convenient or cost effective

 for you.

Post Buying Request