Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB,CFR,CIF,EXW |
Payment Terms: | L/C, T/T |
Supply Ability: | 2-3t/h |
Place of Origin: | Henan |
Location: | Zhengzhou, Henan, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Saw Dust Briquette Machine, High Briquette Machine, Iron Powder Briquette Machine, Dry Powder Briquette Machine, |
Model No.: | TF-180 |
---|---|
Means of Transport: | Ocean |
Model: | TF-180 |
Capacity: | 2-3t/h |
Spindle Speed: | 39-60Rev/min |
Production Capacity: | 2-3t/h |
Packing: | 40'GP |
Delivery Date: | 30days after confirm the order |
Working Principle
Coal
rods machine is a machine tool for the different shape of the powder
coal. Its working principle is: the motor through the triangle belt
transmission to the transmission, the transmission output shaft through
the floating coupling to push the propulsion shaft, the propulsion shaft
to promote the coal feed through the forming die, and then give birth
to an ideal high pressure coal rod.
Structure Features
1.The feed screw leads to large, feed into the material quickly, and promote the small, the province power.
2.Shaft block with the use of rigid connection, high degree of resistance, anti - thrust, machine stability
3.The need to seal the use of fault structure, the dirt from the fault
4.Triangle belt drive, smooth operation, low noise, and its overload protection
5.The head and cylinder are connected with the card ring structure and the structure of the bolt.
Installation and Commissioning
1.
The installation of spare parts must be thoroughly cleaned, removal of
the transport or storage of a long time of rust, and check the parts are
not damaged.
2.
Based on the diagram on the basis of concrete pouring, and concrete
screw, after the solidification of the coal rod machine dipping in
concrete based on screw alignment, two concrete grouting, anchor bolts
to be solidified, correct the machine level, the machine can be stable
test machine.
3.
Before the test machine will be the lubrication of lubrication, oil
content is moderate. Check all the bolts if there is a loose phenomenon,
and tighten. Point to move the machine to see if there is a foreign
body or abnormal sound. All confirmed that no party can start running.
And check the power direction is correct.
4.
The machine idle for 3~5 minutes, then all the normal feeding trial,
new machine feeding should be uniform, moderate (wet and dry water
generally contain 12%~15%).
Use and Maintenance
1.Every
shift before the boot of the rotation is flexible; there is no abnormal
sound, empty machine running 2-3 minutes to feed production.
2.Raw
materials must be processed , the maximum particle size of less than
3mm, adding water, adding binder, curing agent, can be used by mixing
retting after 24 hours.
3.Feed the blockage, using wood or bamboo dredge, avoid the use of metal bar.
4.The machine rotating part of the bearing should be the temperature is not more than 60 degrees.
5.Stop
before stopping the material, the cylinder body material to squeeze the
air down, and the demolition of the machine head, after washing, to
prepare for work.
6.In order to make the meter not exceed the load operation, the user to install the current voltage meter, according to the current meter to adjust the amount of material and water content.
Technical Parameters
Model: TF-180
Capacity: 2-3t/h
Molding Specification: Dia20-60
Spindle Speed: 39-60Rev/min
Helical Blade Number: 4
Electric Machinery: 18.5kw, 22kw
Reducer: ZQ400
Bearing: 7511,211,210,1305
Remarks: The spindle speed is the lowest speed, according to the current size of the load weight. Yield increase.