Min. Order: | 100 Piece/Pieces |
---|---|
Trade Term: | FOB,CFR |
Payment Terms: | L/C, D/A, T/T |
Supply Ability: | 10000pcs |
Place of Origin: | Hebei |
Location: | Cangzhou, Hebei, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Metal Parts, Precision Casting, Sheet Metal Stamping |
Model No.: | Precision castings-003 |
---|---|
Means of Transport: | Ocean, Air, Land |
Brand Name: | strong |
process: | CNC |
Application: | for machinery parts |
OEM: | Welcome |
small order: | acceptable |
sample: | free |
Production Capacity: | 10000pcs |
Packing: | cartons |
Delivery Date: | 10 days |
Process | Investment casting(lost wax casting), silicasol lost wax casting,die casting |
Processing ability | Surface finishment: Ra1.6-Ra3.2 |
Size tolerance: VDG P690 D2 | |
Maximum size: ≤1200mm×800mm×400mm | |
Weight range: 0.1Kg-120Kg | |
Material | Stainless steel,alloy steel,carbon steel or other iron-based alloy |
Brass CuZn38,H62 Aluminum bronze AB2 | |
Cast aluminium alloy ZL101,ZL114A,A356 | |
Application | Mechanical parts and machinery components Boat parts and Marine hardware construction hardware Auto parts and accessories Medical Instrument parts pump & valve parts and accessories Impellers and propellers(propellors) Pipe Fittings or pipeline accessories Other industry metal casting parts |
DESIGN | Various type of 2D or 3D drawings are acceptable,such as JPG,PDF,DWG,DXF,IGS,STP,X_T,SLDPRT etc. |
STANDARDS | AISI,ATSM,UNI,BS,DIN,JIS,GB etc. |
INSPECTION | Dimension inspection Chemical composition analysis (Spectrum analysis) Mechanical property testing X-Ray inspection Dye Penetrant Inspection Magnetic powder inspection Metallographic inspections |
1.We can rely on your quality?
A:1)Incoming Inspection,There is a formal procedure for incoming inspection;All purchased items come to a central location that is clearly marked as "Incoming Area".
2)Production Area,A formal procedure for developing process sheets and producing parts exists;The formal production procedure is readily accessible;
The formal production procedure is implemented on the production line;A formal procedure for inspecting production parts exists;The formal procedure for inspecting production parts is readily available;
The formal procedure for inspecting parts includes methodology of inspection on the line.
3)Quality Department,The factory is ISO 9001 certified;Management is fully committed to quality;A quality manual exists, containing all quality procedures;A separate manual exists that provides AQL data and methods of handling discrepant materials;An internal audit is conducted on a regular basis;Any deficiencies noted in internal audit are addressed on a regular basis;A formal procedure for calibration of inspection tools exists and is being implemented;
A formal procedure for control of records exists and is being implemented.
4)Packing and Shipping,The procedure provides all instructions necessary to pack per the customer's requirements
2.Can you guaramtee the delivery time?
A:We enjoy a good reputation of timely delivery amomg our customers,products can be delivered according to your requirement strictly.