Place of Origin: | Guangdong |
---|
Location: | Dongguan, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Automotive Stamping Die, Tandem Die, Transfer Die |
Model No.: | AIA-1 |
---|
Progressive Blanking for High Precision Stamping Die for Metal Parts
Factory Introduction
Xander Tool is located in the economically developed pearl river delta - Tangxia, Dongguan. The traffic is very convenient, only 40 minutes’ ride to Shenzhen International Airport and 100 minutes to Guangzhou International Airport. The factory covers an area of more than 6000 square meters, and with more than 150 outstanding employees . In August 2009, the company passed the ISO 9001:2008 international quality system certification.
Xander Capacity
Product Name |
Automotive Stamping Die |
Die Steel |
DC53 / D2 / SKD11 / Cr12MoV / 45# / P20 |
Standard Parts |
Dadco / Fibro / Kaller / Dayton / Punch / Misumi |
Design Software |
UG / Pro-E / Catia / Visi |
Die Type |
Progressive / Transfer / Tandem |
Press for Tryout |
600T / 400T / 200T / 110T |
Die life |
1000000 - 3000000 strokes |
Lead Time for First Part |
20 - 30 days after design confirmed |
Xander Management Process
Step |
Action |
1 |
Receive customer's drawing for quotation |
2 |
Quotation |
3 |
Receive PO |
4 |
Strip Layout Design |
5 |
Strip Layout Review |
6 |
Strip Layout Approval |
7 |
Die Design |
8 |
Die Design Review |
9 |
Die Design Approval |
10 |
Material/Components Purchasing |
11 |
Detail Drawings |
12 |
Die Machining |
13 |
Die Assembly |
14 |
Die Tryout |
15 |
Quality Test |
16 |
Die Buyoff |
17 |
Die Shipment |