user login

Chrome - free Water Base dacromet coating Zinc - Al Flake Paint

Place of Origin: Guangdong

Company Profile

Location: Changzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer
Main Products: Zinc Flake Coating, Water Based Top Coat, Dip Spin Coating Machine

Product Detail

Model No.: AIA-1

Product Description

 
 
Technical Data Sheet
1   Product Information 
Trade Name: Zincover
Article/Model No.:JH-9310

2   Composition/information on ingredients
JH-9310 is made up of three packs: A,B and C;
Pack A: It is silver gray slurry that mainly chemically combined with super fine flake Zn, super fine flake Al and organic  additive. 
Pack B: It is water solution that mainly combined with corrosion protecion additive, particular regulator water solution etc.
Pack C: It is the tackifier  of the coating which mainly made up of cellulose white or yellowish powder. 

 
 
3   Performance Charcteristic
Chrome free , film is silver grey to silver white, better corrosion protection performance.
 
 
4   Coating Process
4.1 Mix Ratio
Pack A: Pack B: Pack C=1:1: X(according to different viscosity demand )
4.2 
Before Mixture, Keep weighted A&B into the water bath at 25±2 , then stir A to make metal slurry disperse  uniformly by frequency mixer ,after A is fully evenly dispersed, reduce the agitating speed to 60r/min, and add  B.
4.3  
Add B to the stirring A slowly.
4.4  
Stir the mixture about 1~2 hours  after B added, then add C.  C should be powdered if lump exist.(The barrel temperature should not be lower than 20, otherwise  C will not be dissolved sufficiently .)Then stir 12 hours alowly and continuously.
4.5
The coating should be filtrated by 80-100 mesh stainless steel screen before pouring into dip barrel.
v
4.6
Temperature control device should be equipped with dip barrel to keep the temperature of coating at 22±2.(If temp. is too high, the paint is liable to deteriorate, and viscosity will be effected.) The coating should be stirred circularly to keep evenly dispersed.
4.7
Test Specific gravity,PH,Temperature,Viscosity of coating every 8 hours if operate continuously.

 
 
5   Technical data
 

No.

Item

Data

1

PH  (20)

5.0-8.0

2

Specific gravity (20)

1.30-1.40 (spray coating)

3

Viscosity

According to operating demand.

4

Operating temperature

22±2

 
 
 
6  Mix Diagram
 

Caution: Temperature should be controlled in above operation.
 
 
 
7   Coating Process
 

7.1  Degreasing
The workpiece should be degreased if there is oil on the surface. There are three processing methods:
1.High temperature
2.Neutral water-base degreasing agent
3.Organic solvent such as methylene chloride.

7.2   Derusting
The workpiece can not be coated if there is rust or burr on the surface.The best processing method is shot blasting. The corrosion resistance of coating will be effected if acid cleaning adopted.

7.3   Coating
The workpiece afer degreasing and shot blasting should be coated through Dip-Spin coating or Spraying Coating.

7.4   Pre-heating
The workpiece after coated should be Pre-heated as soon as possible at 80~150 for 8~15 mins to evaporate. ( according to heat absorption of workpiece.)

7.5   Curing
The workpiece after pre-heating should be cured at  300-340 for 15~30 mins. ( according to heat absorption of workpiece.)

 
 
8    Attentions
Other chemicals such as any kinds of acid, alkali salt can not be mixed into coating, for these can activate Zn & Al plate to aging the coating.
Avoid irradiation of sunshine and ultraviolet ray  for long time when operating, otherwise it will accelerate aging or polymerization of the coating .
It is very important to control the temperature of coating. If the temperature of coating changes when operating, it will effect the viscosity, then effec the coating quatity on workpiece. So the relations among temperature,viscosity and spinning process shoud be controlled well when coating.
The viscosity will be different  if coating method is different.  Choose low data if spray coating,and choose high data if dip spin coating.

 
 
9   Packing
Pack A:
16kg/ Metal Barrel
Pack B:
50kg/200kg/1000kg Plastic Barrel
Pack C:
metal barrel

 
 
10   Quality guarantee period
Before compound   6 months  at 5~ 20 
After compound      30 days    at 5~20
Try to avoid  transportation in hot seasons or stored in container with high temperature for a long time. And delivery the coating as soon as possible. The best transport temperature should control under 30.

Post Buying Request