Place of Origin: | Guangdong |
---|
Location: | Changzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Zinc Flake Coating, Water Based Top Coat, Dip Spin Coating Machine |
Model No.: | AIA-1 |
---|
We reference domestic and abroad technology and formula under the case can not be removed in the putty and oxide skin. Suitable for cleaning of all kinds of water based cleaning agent.
Brief Introduction
Preparation of tank liquid |
We reference domestic and abroad technology and formula under the case can not be removed in the putty and oxide skin. We develop and produce the JH-23 Ash removal agent after using high quality raw material ,which the effect of removing gray is obviously. The cost of using it is low. And the effect of which removing the appearance of putty and heavy metal oxide attached is obviously. There is no demand of allocation of water quality Add 200-250kg JH-8523 in every 1000 tank liquid. |
Main index
Test method
Preparation of tank liquid |
Appearance light yellow or colorless liquid PH value(5%) 1-2 Total acid 250-500 Free acid 100-250 Temperature normal temperature -40 Process Impregnation
Total acid Use pipette to move 10 ml solution to conical flask, add 3 to 4 drops of phenolphthalein indicator, then titrated with 0.1N NaOH, until the color from colorless to stable red, then the wasting 0.1N NaOH is the total acidity bath. Free acid Use pipette to move 10 ml solution to conical flask,add 3 to 4 drops of bromorphenol blue indicator,then titrated with 0.1N NaOH, until the color from light yellow to light blue,then the wasting 0.1N NaOH is the total acidity bath. PH value Determination of the pH value by pH meter
The first preparation 1 m³ Add 200-250kg JH-8523 in the tank, and water to 1 m³,stiring until completely dissolved. Adjust 1m³:With the continuous work of the tank liquid. The total acid will drop gradually, we should add and measure JH-8523 regularly. The tank liquid should add 2kg JH-8523 generally. The free acid will grow up 1.5 point, the total acid will grow up 3 point. Before the work had done ,should using the flowing water wash clearly. And it should be deal with anti-rust.
|
packing |
Wear protective glasses, rubber gloves and wear protective clothing during processing. Avoid direct contact with eyes,skin,clothing and equipment. Get medical attention if accident happen. |
guarantee period |
25kg/barrel |
wastewater treatment |
One year |