Place of Origin: | Guangdong |
---|
Location: | Dongguan, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Doll Clothes, Doll Dress, Doll Shoes |
Model No.: | AIA-1 |
---|
Description:
1 . Our products are liked by children, widely sales in European, France, American and so on.
2 . We can print logo and change package according to clients’ request.
3 . The size and color can be with your appreciated.
4 . Available for 18 inch doll.
5 . Safety material.
6 . Payments Term : 30% deposits in advance , 70% balance before shipping.
Applications:
ITEM NO |
CDD16 |
INCLUDING |
DRESS |
MATERIALS |
FABRIC |
SIZE |
FIT FOR 18 INCH DOLLS |
BRAND NAME |
CUTE DOLLCLOTHES |
CERTIFICATE: |
ASTM F963; EN71 |
PACKGING |
1 PC/Polybag,suitable quantity in a carton box |
WEIGHT |
SUITABLE |
CBM |
|
MINIMUM QUANTITY |
1000 SETS |
DELIVERY TIME |
30 DAYS AFTER RECEVING THE PAYMENTS |
PAYMENT TERM |
30%DEPOSITS,70%BALANCE |
OEM |
WELCOME |
PLACE OF ORIGINAL |
CHINA |
Competitive Advantage:
Factory advantage : Our factory established in 1998,have 210 workers,We are the biggest factory that specialized in manufacturing 18 inch doll accessories in China.
Samples advantage : We have a special design department,there are 4 designers and 6 skilled workers serve you,so we can design all your OEM products with good quality and in very Short time.
Safety advantage : All the materials that we used are eco-friendly,can pass the test standard.
FAQ:
What is the minimum quantity of one order?
A : Our minimum order quantity is 500 which is one of the lowest in the industry.
What is your payment term?
A : 1 . 30% T/T deposit when P/O placed and samples approved, and 70% before delivery.
2 . For big order, we can negotiate the payment terms, it should be good for both of us.
What is your sampling and mass production time?
A : Sampling time: 5 to 7 days
Production time: 1 month
How long is the delivery time?
A : Shipping by vessel will take 2 to 4 weeks according to different destination port
Shipping by air will take 5 to 10 days
If all the materials can pass the safety testing for phthalates and lead?
A : Yes, All materials of our products are comply to the international safety standard and can pass European test standard, ASTM F963, and EN71.
How can I get the samples?
A : 1 . For new customer, we'll request sample fee, it will be deducted if the new order confirmed;
the customer need to bear the postage charges.
2 . For old customer, we can provide free sample according to the complexity of the product.
the customer need to bear the postage charges.
Are your doll accessories made with high quality?
A : We have some of the best doll accessories designers in the industry, with extensive experience in making any doll item you can imagine!!! High quality is crucial to our customers, and we back our products with great customer service! We strive for 100% customer satisfaction, and will work with you to create your products to look and feel exactly the way you want it!