user login

ASTM DIN Truck Transmission Input Shaft / Steel Gear Wheel Shaft

Place of Origin: Zhejiang

Company Profile

Location: Luoyang, Henan, China (Mainland)
Business Type: Manufacturer
Main Products: Bevel Gears, Gear Shaft, Ring Gears

Product Detail

Model No.: Forged Steel Roller Shafts

Product Description

ASTM DIN Truck Transmission Input Shaft / Steel Gear Wheel Shaft 

 

Our services                                                      

Satisfy the customers with quality,Strictly quality control,constantly developing new technology products,Prompt Delivery

Why choose us ?                                                

The most important reason is that we provide really Low Price and Original OEM Quality.

 Low Price 

 

How can we can make it?

1.Low price for material.

We get the best price for material ,since all of our products are volume produced, and we have long term cooperation material suppliers.we are able to have the best resources integrated in China.

2.Low cost for production.

We do all the process by ourselves. we have complete plants and equipment for auto parts: molding, cutting, lathing, grinding and polishing, etc..

3.0 cost for advertising expense.

To cut the cost,we don’t pay any expense for advertising.

Quality Assurance 

How about the quality?  

All of our products are manufactured with advanced equipment and strict QC procedures in order to ensure high quality.

Product name  ForgedSteel Roller Shafts
Material Steel,stainless steel,brass,copper, bearing alloy 
Process Forging,carburization and teeth milling, sand blasting
Color Silver gray,natural color
Packing Neutual pakage /Standard exporting package
MOQ 1 PCS
Delivery time 15-50days

 

Forged Steel Roller ShaftsTest equipment                                                   

 

IQC(incoming material quality check)-IPQC(in process quality control)-FQC(final quality assessment)-OQC(output quality check) 

Packaging and Shipping                                      

MOQ: Steel Gear Wheel Shaft 1 piece

Packing: Neutral packing or Standard exporting package

Delivery: 15~50 days after receiving deposit or negotiation

Sample Delivery Time: 15 Days

Mass Production Time:15-30 Days

Post Buying Request