Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T |
Supply Ability: | 1000 |
Place of Origin: | Jiangsu |
Location: | Suzhou, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Brand Name: | acemien |
---|---|
ship port: | shanghai |
place of origin: | china |
Production Capacity: | 1000 |
Packing: | usual pallet |
Delivery Date: | 1 month |
Description:
It takes the advantages of simple structure, easy operation, high capacity, low energy consumption, safety, reliability, etc. Cleaned material: Impurity content<=0.1%; Water content<=3% Production Capacity: 500-2000kg/h.
This unit is mainly for PET (bottle) flakes: The labels and bottle caps are automatically separated, then after being washed, dewatered and dried, the water content will be very low, and PP/PE film after being washed can be directly granulated (water-ring palletizing), the gained granules are even and smooth with shiny surface. So, it is ideal equipment in waste plastic recycling industry.
Declaration:
Above technical details and photos are indicative. Acemien has the right to change one or more features without previous notice.
3. After-sales service
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD35 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
Guarantee period and after-sales services: 13 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.
Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
3.4. Validity: Three months since quotation date.
We thank you for your inquiry and would be pleased to receive your order soon.
Zhangjiagang Acemien Machinery Co., Ltd.