Place of Origin: | Zhejiang |
---|
Location: | Guangzhou, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Outdoor Playground Equipment, Adventure Playground Equipment, Indoor Playground Equipment |
Model No.: | RKQ-5209A |
---|
25 Years Experiences Kids Soft Indoor Play Centre With 70 Countries Real Projects
Type: indoor safety soft play equipment for sale
Size: 2500*1000*700cm
Can be Customized. For the soft play centre, each room of which is different in structure,
We have to redesign the products according to the interior structure .
The pictures showed here just for your reference.
When contact us, please attach your floor plan or CAD drawing.
Theme: Mole manor Theme
Age group: 2-15 years old
Material:
1. Plastic parts: imported LLDPE from Korea.
2. Post: thickness:1.5mm , diameter:48mm galvanized pipe with PVC foam coated
3. Soft Parts : Innermost: wood ; Middle: Sponge ; Outmost : PVC cover
4. Mat : EVA , thickness: 2cm and colors for your selections
Package: Packed with bubble film, Blanket.
Installation:
Professional 3D instruction,installation teaching video with assembly procedure will be provided by us.
Technical engineer also can be sent if you need.
Advantages:
1) We have 25 years production experience in the industry
2) Anti-static, Anti-skid and Anti-crack
3) Custom-made design freely by our professional designer
4) CE,ISO9001certification,reasonable design, ensure kids’ safety
Production time:
In general,20-25 working days after your deposit received.
It depends on the size of the playground.
Capacity:
20-50 m2 for about 15-30 children,
50-100m2 for about 25-50 children,
100-200m2 for about 40-80 children,
More than 200m2 about 80-200 children.
Usage:
Amusement park,shopping mall, game center, hotel ,pre-school, etc.
Function:
Climb, jump, crawl, run, throw activities can stimulated children's curiosity, exploring desire, and build up their consciousness of team work and their abilities of cognition, judgment and problem-solving.
Attention Please
1) The method of installation for the soft ground and sand ground.
in order to consolidate the equipment to the ground,for each support steel pipe,you need to dig a big hold
in the ground,the deep is around 40meters,and then make a concrete barrier with a size of 30*30cm,and
put it into the holde,then,screw the steel pipe of the products on it,then cover the hold.
2) Installation for Normal concrete ground.
You only need to screw the support steel pipes on the ground.
The installation of above should be made after you get the products.
You need to leave additional 1m for each size of the playground as for the safety place.
Our cases all over the world