user login

H frame Substaton dead end structure

1150.0 USD
Min. Order: 1 Ton
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 40000tons/year
Place of Origin: Shandong

Company Profile

Location: Qingdao, Shandong, China (Mainland)
Business Type: Manufacturer
Main Products: Transmission Tower;telecommunication Towers;clamps;wind Generator;light Pole;wide Turbine;telecom Tower;hardwares

Product Detail

Means of Transport: Ocean
Brand Name: MEGATRO
Production Capacity: 40000tons/year
Packing: export stanard package
Delivery Date: 30days or as per client
Show

Product Description

MEGATRO provide design and fabrication of H-frame Substation dead-end structure for our overseas clients.  

H-frame Substation dead-end structures consist of circular pipes which welded or bolted together as steel supports for substation equipments. Our H-frame Substation dead-end structures have features as follow:

Custom designed to meet your dimensional requirements

Certified drawings & calculation package provided

Galvanized to ASTM A123

Design codes and specifications:

Industry: NESC, IEEE standard 605, and ASCE Manual 113

Wind: per 2009 IBC & ASCE/SEI7-05

Seismic: per 2006 IBC section 1613, ASCE 7-05 section 15.1.3 &12.8

Welding: ANSI/AWS D1.1-06

In material, we adopt high strength steel such as ASTM A572 GR50, GR65, Q420, Q460, S355J0, S355J0, Fe510, ST52 or other equivalent steel to meet project requirements. MEGATRO can optimize design and make H-frame Substation dead-end structure with solid, high strength, good wind resistance, and economy in the use of materials.  

After fabrication all H-frame Substation dead-end structure, are delivered to the galvanizing facility to be Hot DIP Galvanized. H-frame Substation dead-end structures are processed through the facility by Caustic Cleaning, Pickling, and then Fluxing. These strict procedures insure years of maintenance free towers.     


Fabrication: Conform to clients' drawings and technical requirements
Place of Origin: Qingdao, Shandong, China.
Availability size: Based on the customer's requirements.
Material: Chinese material or as per client requirements
Package: Both party discuss and agreed before delivery
Terms of Payment: L/C; T/T
Minimum Order Quantity: 1 TON

Port of Loading: Qingdao  Port
Lead Time: One month or based on the customer's needs.

Performance Standard
Besides conform to the drawing and design, the materials and fabrication of tower components shall conform to Chinese Standards or international standard.


Post Buying Request