Min. Order: | 1 Piece/Pieces |
---|---|
Trade Term: | EXW |
Payment Terms: | T/T |
Supply Ability: | 10000tons/month |
Place of Origin: | Hunan |
Location: | Changsha, Hunan, China (Mainland) |
---|---|
Business Type: | Manufacturer, Distributor/Wholesaler |
Main Products: | Scaffolding, Steel Plank, Steel Ladder, Steel Pipe |
Model No.: | WD-GRS |
---|---|
Means of Transport: | Ocean, Air, Land |
Brand Name: | WORLD |
Production Capacity: | 10000tons/month |
Packing: | Bulble Cotton, Woven bag |
Delivery Date: | 25-30 |
1.Lower total costs, low loss rate
2.Easy, smart, safer
3.Can be mobile with castor(optional)Worldwide used ringlock scaffolding system with superior safety.
4.Round ring joint at four way, high flexibility and adaptability, circular scaffolding available.
5.Diagonal brace better improves stability of layher verticals and horizontals.
6.Forging steel ring and ledger head fixed on tube by automatic welding.
7.Hot dip galvanized coatings prolongs the performance of scaffolding in wet condition.
8.Ringlock System Scaffolding can be erected to be upright scaffold tower for more than 70meters high.
Standard Length:3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm
Ledger Length:3000mm, 2500mm, 2000mm, 1500mm, 1200mm,1000mm
Rosette Intervals:500mm
Tube Diameter:48mm
Tube thickness:3.25mm
Test Standard:AS/NZS 1576