user login

Mechanical Splices Reinforcement Couplers for Hangzhou Bay Sea Crossing Bridge , China

Place of Origin: Zhejiang

Company Profile

Location: Changzhou, Jiangsu, China (Mainland)
Business Type: Manufacturer
Main Products: Rebar Coupler, Rebar Splice Coupler, Threaded Rebar Coupler

Product Detail

Model No.: 12mm-40mm

Product Description

 

Rebar Splice Coupler Of Super Upset Forging Splicing , High Strength

 

Specifications:

Steel bar diameter

Outer diameter of coupler (MM)

Length of coupler (MM)

Size of thread (MM)

12

20

30

M14*2.0

14

22

34

M16*2.0

16

26

40

M20*2.5

18

29

44

M22*2.5

20

32

48

M24*3.0

22

36

52

M27*3.0

25

40

60

M30*3.5

28

44.5

66

M33*3.5

32

50

72

M36*4.0

36

56

80

M39*4.0

40

62

90

M45*4.0

 

Description:

JBCZ Steel bar splicing system is belong upset forging parallel thread system. It can link two rebars whose

 diameter is from 12mm to 40mm.

The bridge is 36 km and is 11 km long than the king fahd bridge who links bahrain to Saudi Arabia , had to

 keep the Chinese association of world records  for the world's longest cross-sea bridge, it becomes the  

world's third long bridge following in the United States now lake pontchartrain bridge and Qingdao jiaozhou 

bay bridge .

Also , this famous project used couplers produced by JBCZ . JBCZ ‘s rebar splice system become very 

mature.

 

Applications:

Bridge Project

Hangzhou Bay Crossing Sea Bridge,China

 

 

Competitive Advantage:

  1.  Designed to splice the same diameter bars
  2.  Installs quickly and easily
  3.  High efficient
  4.  High adaptability
Post Buying Request