user login

3 ton lorry mounted crane

Min. Order: 1 Set/Sets
Trade Term: CIF
Payment Terms: L/C, T/T, WU
Supply Ability: 300sets/month
Place of Origin: Shandong

Company Profile

Location: Jining, Shandong, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Construction Machinery, Crane, Loader, Excavator

Product Detail

Means of Transport: Ocean, Land
Brand Name: Wolwa
Production Capacity: 300sets/month
Packing: FCL
Delivery Date: 15days after receiving the payment
Show

Product Description

Product parameter:

Chassis:Tangjun ouling 3200(490 engine)

 

Overall dimention: 5860*1915*2110mm

 

Max. lifting torque:42Kn.m

 

Max. lifting capacity:3000kg

 

Max. working scope:6.0m

 

Amplitude:0-70°

 

Rotating angle:360°

 

Total weight:2800kg

 

 

Can be ordered as customer request in case of safety.

 

Operational considerations:

 

1. The drivers must pass a professional safety training, approved by the relevant 

 

departments of the inspection, get a certificate, then operate separately. 

 

Undocumented workers are strictly prohibited to use the equipment.

 

2. Before working, each operating device is to be checked: whether the rope is 

 

in line with safety rules, or braking and hydraulic devices is reliable. It is strictly 

 

prohibited to run in case of fault machine elements.

 

3. Lifting boom elevation shall not be less than 30 °, the crane in load cases should try 

 

to avoid ups and downs job. It is strictly prohibited to transform  joystick before landing safely.

 

4. Drivers must be in close coordination with the rigger, obey the command signal of the 

 

rigger. Before operation, there must be a honk. When commanding gesture is not clear 

 

or error is found, the driver have the right to refuse to perform. The driver must stop 

 

the work immediately when there is emergency stop signal from someone, can continue 

 

to work to eliminate unsafe factors.

 

5. Must obey all traffic rules and regulations, drunk driving is forbidden. When driving, 

 

no smoking, eating and chatting.

 

6. When lifting a heavy piece, the distance between the weight lifting and the ground 

 

is about 10 centimeters. And check whether the the crane is stable and brake flexible 

 

and effective, then continue to work confirming everything is normal.


Post Buying Request