Mould for slurry forming
a) Quick-wear part
No. |
Name |
specifications |
Remark |
1 |
Rubber gasket |
Rubber |
|
2 |
Springs |
6212-Z |
|
3 |
disc spring |
C112-1 |
|
4 |
|
|
|
b) Uses
The mould is special tool for casting blanks. When the slurry from the mixer cavity is purred into the injection mould, the cutting blanks will come out after being fermented nursing, and the die frame being removed.
Length:6750 mm Width:1768 mm Height:1078 mm
2 Cake size
Length:6000 mm Width:600 mm Height:1275 mm
3 Weight: 1955.18kg (including the side plate weight, 512kg)
4 Seal material: GCB6-89 foam rubber
c) Structure
The mould is composed of frame, side plate (base plate) and clamp arm, etc.
1. Mould
The frame is made of steel and it has good rigidity and it is light.
There is turning shaft in the both end, and it has seal to prevent the casting leakage. The structure is very
reasonable and it is easy to turn.
2. Side plate (base plate)
The side plate is made of steel and welding plate. It has good rigidity that it is hard to deform when being
put into the autoclave.
3. Clamp arm
The clamp arm is composed of clamp wheel, arm and turning shaft, the driving comes from the turnover
hanger spanner device.
d) Work principles
The mould should make the frame, side plate and clamp arm be together, and then it can work, and it should have turnover hanger when it works.
1. Mould frame
The frame is the main body of the mould, when the side plate is assembled and tightened by the clamp
arm, and turn up to 90°, it can cast the blank. The hanger lift it in the sky and turn 90° after the casting,
the casting blank is lifted to the cutting trolley vertically, loose the clamp arm, remove the frame, the
casting blank can be cut then.
2. Side plate
The side plate is the plate used for opening the closed mould frame, and then it will be clamped by the
arm and be close to the frame seal, then turn 90°, remove the mould on the cutting platform and it will
become the base plate for the casting blank.
3. Clamp arm
The clamp arm is connected to the spanner of the turnover hanger, the spanner turns 90° with the help of