Steel Reinforced HDPE Pipe Extruder Machine / Production Line

Place of Origin: Zhejiang

Company Profile

Location: Qingdao, Shandong, China (Mainland)
Business Type: Manufacturer
Main Products: Plastic Extruder Machine, Single Screw Extruder, Twin Screw Extruder

Product Detail

Model No.: SJS

Product Description

         Steel Reinforced HDPE Pipe Extruder  Machine / Production Line (300mm-1200mm)

         Steel Reinforced PE Pipe Making Machine ( 300mm-1200mm) is used to produce 300mm-1200mm  diameter hollow wall winding HDPE and steel reinforced pipe.

           

           

     Steel Reinforced PE Pipe Extruder Machine (300mm-1200mm) Specification:

          DIAMETER:300mm-1200mm

          TOTAL INSTALL POWER: 100Kw, 380 V three phases, 50HZ

          LOAD FACTOR: 50%-80%

          WORK HOUSE: 35M×16 M

                CIRCULAR COOLING-WATER:3L/min  ≤20  ≥0.3Mpa 

                Compressed air  : 0.3m3/min 0.5Mpa

               

      Configuration of Steel Reinforced HDPE Pipe Machine (300mm-1200mm):

               1, Belt unreeling machine 

               2, Bending form machine 

               3, TSJS90/33 Extruder

               4,Extrusion mould and passageway

               5,Cooling forming platform    

               6,  crawler belt haul-off    

               7, Cutter

               8,Blet transfer  (traction mode)                         1set

               9,TS30/30 Single screw extruder                      1 set

               10, Cutter                                                         1set

               11,Stacker                                                        3 set

         12,Automatic control system:                           1 set

     Technology and Service:

     1. Seller supply full set of technical document, cutter and other full document (write in English).  

     2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.  

     3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.

     4. Buyer should pay the expense for our engineers including for our engineer including round-

      way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.

     5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all 

      conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing 

      and testing these machines. Buyer should pay 60USD/day.

     6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working 

      condition,any problem, should discuss peacefully and kindly.

     7. Buyer supply proper working tools, equipments and other conditions.

     8. The expense including the accommodation and materials of the trial-

      run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,

      if the buyer or their representatives do the inspection of the machines before shipment.

    9. Guarantee period: 14 months after shipment (the date of B/L)

    