Place of Origin: | Zhejiang |
---|
Location: | Qingdao, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Plastic Extruder Machine, Single Screw Extruder, Twin Screw Extruder |
Model No.: | SJS |
---|
HDPE gas pipe extruder / extrusion machine / production line (16mm-63mm)
This HDPE gas pipe extruder / extrusion machine is mainly used to produce HDPE gas pipe for water / gas supply, and sewage and drain pipe, also undergroud pipes.
HDPE gas pipe extruder / extrusion machine / production line (16mm-63mm) Introduction:
1. Total installed power:120Kw, 380 V three phases+N+G, 50HZ
Load factor: 55%-80% (Actual power is 80kw)
2. Cooling circulars water: 10 m3/h
3. Compress air:0. 8m3/min
4. Workhouse: 50000×3000×2600mm(length, width and high of line)
5. Products dimension: 16mm-63mm
6. Raw material :HDPE 100
7.Pipe working Pressure:SDR9 & SDR11
8.Output:180 kgs per hour
The HDPE gas pipe extruder / extrusion machine / production line video:https://youtu.be/3WkyB6oXQTM
HDPE gas pipe extruder / extrusion machine / production line Machinery Specification:
All the HDPE pipe production line:
1. Automatic Feeder and drying hopper
2. Single Screw Extruder 65/33
3. HDPEPIPE molds (SDR11,SDR17)
4. Vacuum sizing tank
5. spray cooling tank
6. Heating printer with all letter blocks
7. Belt haul-off unit
8. Non scrap Cutting unit:
9. Stack unit
10. Winder
11. Electric Control Cabinet
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment (the date of B/L)