user login

Plastics Extruder Plastic Pipe Production Line for PVC Spiral Reinforced Hose

Place of Origin: Zhejiang

Company Profile

Location: Qingdao, Shandong, China (Mainland)
Business Type: Manufacturer
Main Products: Plastic Extruder Machine, Single Screw Extruder, Twin Screw Extruder

Product Detail

Model No.: Single screw

Product Description

PVC spiral reinforced hose / pipe extrusion machine , Plastic Pipe Production Line

 

This PVC spiral reinforced hose / pipe extrusion machine is designed to produce PVC spiral reinforced hose( like the picture,could be defferen color ).

The wall of which is soft PVC and rigid PVC helix as reinforced, featuring extrusion resistance, corrosion resistance, negative pressure resistance, anti-bending, good negotiability, so it is suitable to converying gas, liquid and powder.

 

 

PVC spiral reinforced hose / pipe extrusion machine condition :

Installed Power: 66KVA, 440 V three phases+natural+ground, 60HZ        

Load Factor: 50%-80%

Workhouse: 20000mm×3000mm

Circulation cooling water: 1m3/h

Pipe ID: 2”,2.5”,3”,4”,5”,6” 

 

This PVC spiral reinforced hose / pipe extrusion machine consists of:

A. SJ65/28 Single Screw Extruder 2 sets

One is for hard PVC extrusion and the other is for soft PVC extrusion

B. Die Head/Mould Parts 1 set

C. Spiral Forming Machine 1 set

D. Water Cooling Tank 1 set

E. Spiral Hose Haul-off Machine 1 set

F. Transporting Frame 1 set

G. Storage Silage 1 set

H. Single Roller Spiral Hose Winder 1 set

I. Electrical Cabinet 1 set

Diameter of pipe(mm)

Extruder Speed(m/min) Max.output(kg/h) Power(kw) Dimension(L*W*H)
20-63

SJ55/28

SJ55/28

2-10 70 60 35m*3.5m*2.5m
75-200

SJ65/28

SJ65/28

0.2-2 100 90 45m*3.5m*2.5m

 

Technology and Service:

1. Seller supply full set of technical document, cutter and other full document (write in English).  

2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.  

3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.

4. Buyer should pay the expense for our engineers including for our engineer including round-

way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.

5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all 

conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing 

and testing these machines. Buyer should pay 60USD/day.

6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working 

Post Buying Request