Min. Order: | 1 Set/Sets |
---|---|
Trade Term: | FOB |
Payment Terms: | T/T, WU |
Supply Ability: | 1000 set one month |
Place of Origin: | Shandong |
Location: | Jining, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Mining Pump , Mining Feeder, Pneumatic Diaphragm Pump, Mining Automatic Adjustment Device, \ |
Means of Transport: | Ocean, Air, Land |
---|---|
Production Capacity: | 1000 set one month |
Packing: | wooden case |
Delivery Date: | 7 days after the received the payment |
Air cannon block clearer Technical parameters:
Model | Capacity | Slinger Hole | Air Intake | Working Pressure | Impact Force | Explosion Energy | Weight |
L | mm | Inch | Mpa | N | J | kg | |
KQP-A-50 | 50 | 14 | G1/2 | 0.4-0.8 | 1370-3720 | 56400 | 40 |
KQP-A-80 | 80 | 16 | G1/2 | 0.4-0.8 | 1580-5100 | 72000 | 45 |
KQP-B-80 | 80 | 16 | G1/2 | 0.4-0.8 | 1580-5100 | 72000 | 45 |
KQP-A-100 | 100 | 16 | G1/2 | 0.4-0.8 | 3000-8000 | 81600 | 50 |
KQP-B-100 | 100 | 16 | G1/2 | 0.4-0.8 | 3000-8000 | 81600 | 50 |
KQP-A-150 | 150 | 16 | G1/2 | 0.4-0.8 | 4500-10000 | 123600 | 70 |
KQP-B-150 | 150 | 16 | G1/2 | 0.4-0.8 | 4500-10000 | 123600 | 70 |
KQP-A-170 | 170 | 16 | G1/2 | 0.4-0.8 | 5500-12500 | 129000 | 81 |
KQP-B-170 | 170 | 16 | G1/2 | 0.4-0.8 | 5500-12500 | 129000 | 81 |
KQP-C-170 | 170 | 16 | G1/2 | 0.4-0.8 | 5500-12500 | 129000 | 81 |
KQP-B-220 | 220 | 16 | G1/2 | 0.4-0.8 | 6000-13000 | 220800 | 95 |
KQP-C-220 | 220 | 16 | G1/2 | 0.4-0.8 | 6000-13000 | 220800 | 95 |
KQP-B-300 | 300 | 16 | G1/2 | 0.4-0.8 | 6350-14500 | 251160 | 125 |
KQP-C-300 | 300 | 16 | G1/2 | 0.4-0.8 | 6350-14650 | 251160 | 125 |
KQP-C-500 | 500 | 20 | G1/2 | 0.4-0.8 | 13800-28700 | 880000 | 197 |
Air Cannon Characteristics:
1. High Temperature
2. Self-lubricating
3. Low maintenance
4. Long Life
5. Strong spray drying
6. Easily compatible with
Control Theory and Function:
After operator starting and running the air cannon, PLC start up the first air cannon through conveying belt or air cannon automatic controller according to the programs designed in advance; Then start the second air cannon until several times after delaying PLC for some time,and starting next circulation control after delaying PLC for some time when the corresponding Air Blaster is launched. The delayed time can be adjusted at anytime. The control device is possessed of manual control function. After operator switches to the manual operation, he can start each solenoid valve manually. Then the corresponding air cannon is started.