user login

Royway high quality Inclined jet micro hydro turbines for sales

259.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,EXW
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 5000
Place of Origin: Chongqing

Company Profile

Location: Chongqing, China (Mainland)
Business Type: Manufacturer
Main Products: The Generator Industrial Engine Marine Equipment

Product Detail

Model No.: XJ
Means of Transport: Ocean, Air
Application: Water Heater
Type: Others
Pipe Material: Others
Brand Name: Rpyway
Excitation: permanent magnet
Production Capacity: 5000
Packing: Wooden case
Delivery Date: 15days-20days
Show

Product Description

Small Hydro Power Generator / Water Turbine Generator 

1).0.3kw to 50kw
2).water head :5m to 40m
3).Flow Rate(m3/s):0.007-0.3
4).Speed(r/min):500 to 1500

5).design and produce according to the power, speed, frequency that you need.

1. Specification of Hydro Generator

1.Good Quality Of Small Hydro Power Generator / Water Turbine Generator Unit with range 

0.3kw-50kw;

2.Offer all types of generators, turbines, hydropower equipment, complete set of hydropower and other power plants, etc.

3.Equipments would be produced according to your request.

4.Engineers for erection and commission at hydropower plant are available.

5.There should be some key parameters (such as head, flow discharge and capacity, if need turbine generator too, 

please supply the frequency and output voltage, if not, give us the rotation speed) in inquiry.

Note: We can design and manufacture various types of hydro generator units with 0.42-7m in turbine 

runner diameter and 0.3KW-50KW in unit capacity.

We adopt standrad exporting package,use environmental protection materials to makesure the package is suitable to long distance transportation.

Our customers have a wider range of processing choices for transportation mode:

 By Express ( FedEx, UPS, DHL, TNT, EMS, etc... )
--- Advantage: Fast ( takes about 7 - 10 days in the delivery ), door to door
--- Disadvantage: A little expensive
By Air Transportation
--- Advantage: Fast ( takes about 8 - 12 days ), a little cheaper than Express.
--- Disadvantage: You need to take the goods from the airport by yourself.
By Sea ( Ocean ) Transportation
--- Advantage: Much cheaper than Express or Air transportation.
--- Disadvantage: Slow and you need to take the goods from your destination port by yourself.

  


Post Buying Request