Place of Origin: | Zhejiang |
---|
Location: | Nanjing, Jiangsu, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Raised Access Floor, Steel Raised Floor, Calcium Sulphate Raised Floor |
Model No.: | XL-1004H |
---|
FS1000 Steel Raised Floor Construction Raised Deck Flooring Customized
Technical Specifications:
Product Name |
Cement infill steel raised floor HPL finish |
|
International |
FS1000HDG600-35BD |
|
Size |
600*600*35mm |
|
Material |
Top& Bottom steel plate welded ,Cement infilled |
|
Fire protect performance |
Class A |
|
Concentrated load |
≥4450N/1000LB/450KG |
|
Impact load |
≥ 670N |
|
Ultimate load |
≥ 13350N |
|
Uniform load |
≥ 23000N/m2 |
|
Rolling load /N |
10 times |
4450N |
10000times |
3560N |
|
Pedestal |
Flat Head Pedestal Top:75*75*3mm Bottom:95*95*2mm M25,Thickness1.2mm |
Description:
1. Prevent static validly;flame retardant,dust proof,anti-skid,anti-rust,anti-soil.
2. Imported glue,strong wear ability,non-bubble,non-degumming,soft light,wear proof,anti-static.
3. High dimensional precision,newly patent”cross strengthening rib”structure,super strength loading,pressurization.
4. Fix conveniently,assembly agility,bottom space could be used for air conditioning.
Applications:
1. Wide manners of computer room, network service room monitor control center, electronic workshop, clean room, dustlessness chamber etc, and occasions which require on anti-static and air conditioning
2. Class five office Security Union Plaza ,Futures Trading Building , and the place demand cabling and wiring
Competitive Advantage:
1. Xiangli patent design”cross strengthening rib”can improve 10-20% loading ability of each floor.
2. The edge load is the key date which can indicate the quality of the raised floor.Xiangli second wide-edge steel raised floor with “cross strengthening rib” has conquered the technical difficulties and make the edge load higher than the center load to solve the edge warping caused by uneven load effectively.
3. Xiangli use the glue from Sino-foreign joint venture.Add 502 glue when the trim is glued ,the trim is hard to drop.