Trade Term: | FOB |
---|---|
Payment Terms: | T/T, WU |
Supply Ability: | 500 pcs/day |
Place of Origin: | Shandong |
Location: | Jining, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Distributor/Wholesaler |
Main Products: | Rock Drill, Shotcrete Machine, Rail Equipment, Pneumatic And Hydraulic Tool |
Means of Transport: | Ocean, Air, Land |
---|---|
Application: | Coal |
Production Capacity: | 500 pcs/day |
Packing: | wooden box |
Delivery Date: | within 3 days after payment |
parameter
1.Apply to switch opening:≤120mm
2.For rail transition resistance: ≤1960N(200KG)
3.Largest linear displacement of rod:209mm
4.In the installation of two sleeper center distance:650mm,
Tie rod and the bifurcation point two centerline distance : 350 mm
5.When installed in the middle of the double line railway line, on both sides of the adjusting handle is apart from the center line of the line should be ≥2250mm