user login

250mm Double Head Plastic Strainer Extruder Machine With Die - Head Auto Opening

Place of Origin: Zhejiang

Company Profile

Location: Lianyungang, Jiangsu, China (Mainland)
Business Type: Manufacturer
Main Products: Internal Mixer, Banbury Internal Mixer, Rubber Internal Mixer

Product Detail

Model No.: SJL Plastic Strainer Machine

Product Description

Application:

Plastic

Certification:

ISO9001:2000, CE

Product Name:

Strainer Exturder, Plastic Strainer Machine

Head:

Double Head

Feature:

Die Head Design

Material For Screw Ang Rolling Mill:

38CrMoAIA

 

 

Description:

 

1) The screw is made of special steel by nitrating treatment making it more durable
2) Jacketed type barrel can be heated for heat preservation
3) Double head strainer can be quickly and easily exchanged
4) Smooth running and high output
5) Equipped with die-head auto opening system when electric power breaks.
6) For removing metal tips, sand, small stones, and other objects from material well as mixing material
7) The die is equipped with auto opening system when the power is cut off

 

 

Applications:

 

This machine removes foreign materials and metallic particles that are mixed during the mixing process. In this way it protects the calender roll. In general, it is put just in front of the calender for soft or semi rigid PVC to remove foreign materials

 

Main Technical Parameter:

Model

SJL-160

SJL-200

SJL-220

SJL-250

SJL-300

SJL-350

Screw diameter(mm)

1600

200

220

250

300

350

Motor(Kw)

55

75

90

110

132

160

Material for screw

38CrMoALA

 

Competitive Advantage:

 

1. Compact type
2. Die head design  
3. Convenient control
4. good quality
5. low price
6. Good aftersale service

 

Option

 

Material put into the feeding inlet of the strainer and it stay warm in the barrel. When the material go through the die-head ,the filter screen will adsorb the impurity. Then the material that become rodlike will be transferred into the calendar.

 

10. commercial terms

1. Payment: 30% by T/T as advance payment, balance(70%) by T/T

  before shipment

2. Lead Time: 60 days after receiving the advance payment

3. Transportation: container, simple package ( PE film, salver)

4.Warranty period: From the day of the use of the machine in the buyer’s

  factory:

   (1) The mechanical Parts: 12 months

   (2) The electrical Parts: 6 months

5. Installations and Commissioning

  (1) Up to date commissioning has been made before shipment

  (2) Overseas Commissioning and charges

   one or two technicians will be sent to the buyer to guide the 

   installation and commissioning of the equipment if the customer

   requests.

   Customers pay the charge of our technicians.

   (1) Round-trip Airplane Ticket

   (2) Charges of transportation, accommodation and communication

   (3) The allowance for the technicians is USD 80 per day for one person.

   (4) An interpreter is needed.

6. Spare parts:

 Spare parts for one year are needed for the customers, and we suggest

 that customers should buy the spare parts. (Fittings list will be

 provided.)

7. English manual, Figuration drawing, and footing drawings are 

  provided.

Post Buying Request