user login

Slag Powder Grinding Plant

100000.0 USD
Min. Order: 1 Set/Sets
Trade Term: FOB,CFR,CIF,DAT
Supply Ability: 0.2 --1.5 million tons
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Service

Product Detail

Model No.: GRM
Brand Name: chaeng
Annual Output: 0.2 --1.5 million tons
Application Equipment: GRMS slag vertical mill
Grinding materials: Blast furnace slag,Steel slag,nickel slag,Manganese slag
Matching equipment: Feed belt+Vibrating screen+slag vertical mill+hot blast stove+dust collector+warehouse
Production Capacity: 0.2 --1.5 million tons
Packing: The main machinery is in nude packing
Delivery Date: within 30days after your payment
Show

Product Description

As the important equivalent substitutes for cement production,GGBFS can not only significantly improve the overall performance of cement and concrete, but also significantly reduce the production cost. Now it has been widely used in cement plant, grinding station and steel factories as a new kind of high effectively admixtures. For this situation, we may say: "who first invests will first benefits."

CHAENG (Great Wall Machinery) can undertake 20 tons --1.5 million tons of Blast furnace slag/Steel slag/Nickel slag/Manganese slag powder production EPC projects. Up to now, CHAENG has constructed more than 100 slag grinding production lines at home and abroad.

Slag Powder Grinding Plant

The stacked slag is packed and feed by the forklift trucks, then transported by belt conveyor. During transmission, the slag will pass through the iron separator and vibrating screen, then through the weighing equipment and elevator, and finally come into the vertical roller mill.slag will come through the powder selector and be dried with the hot air form air heating furnace after grinding. Slag that meets the fineness requirement will pass through the separator, then delivered by air blower and elevator, and finally come to the storage silo.

Post Buying Request