user login

bridge expansion joint concrete repair material

1800.0 USD
Min. Order: 5 Short Ton
Trade Term: FOB
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 1000 tons / month
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Concrete Repaid Repair Materials, Concrete Driveway Crack Repair Materials, Best Concrete Waterproof Repair Mortar, Best Material For Filling Cracks In Concrete Driveway, Bridge Deck Expansion Joint Repair Solution

Product Detail

Model No.: QM
Means of Transport: Ocean
Brand Name: HUINENG
Usage: Repair expansion joint concrete
Initial setting: 25mins
Final setting: 35mins
Compressive strength: 33.0Mpa/ 2 hours
Pulling strength: 2.8Mpa
Expansion rate: 0.01%
Open traffic time: 2 hour
Color: Grey
Certificate: ISO9001
Inspection report: MSDS
Production Capacity: 1000 tons / month
Packing: 25kg/bag
Delivery Date: in one week
Show

Product Description

      Bridge expansion joint concrete repair material

1.Product introduction:

Bridge expansion joint concrete repair material is developed by our Henan Huineng Road and Brdige Technonology Co.,Ltd. it is a kind of single compoent special repair material.


2.Repairs for: 

Bridge expanison joint concrete cracks, pot holes, edge failure, exposed reinforcing bar etc.


3.Core advantage:

Fast repair, 1 h open to traffic, Simple construction, high strength, good toughness, strong adhesion, waterproof anti-freeze, seamless with original concrete, small color difference with original, No broken and fall off under high speed and high voltage driving.


4.Testing data:

Test items 

Unit

Technical requirement

Test result 

Individual conclusion

Setting time

Initial setting

Min

≥20

25

Meet requirement

Final setting 

≤60

35

Compressive strength

2h

Mpa

≥20

33.0

Meet requirement

1d

≥40

66.1

28d

≥50

90.5

Flexural strength

2h


     ≥4

5.5

Meet requirement

1d

     ≥6

    10.5

28d

     ≥8

13.5

Pulling strength

28d

Mpa

     ≥2.0

2.8

Meet requirement

Expansion rate

28d

 /

0.00%-0.1%

0.01%

Meet requirement

5.Repair process:

Traffic control→Marking out→Joint-cutting→Chiseling→Placing striped cloth

→Cleaning→Welding→Washing→Mixing material→Repairing→Curing→Open to traffic


6.Package and Storage:

1.Package: Paper plastic composite bag packaging, 25kg/bag.

2.Storage: Stored in dry and cool place,rain-proof, water-proof.

3.Storage period: 12 months



Post Buying Request