Min. Order: | 5 Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, D/P, D/A, T/T, WU |
Supply Ability: | 1000 tons one month |
Place of Origin: | Henan |
Location: | Zhengzhou, Henan, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Concrete Repaid Repair Materials, Concrete Driveway Crack Repair Materials, Best Concrete Waterproof Repair Mortar, Best Material For Filling Cracks In Concrete Driveway, Bridge Deck Expansion Joint Repair Solution |
Model No.: | SC |
---|---|
Means of Transport: | Ocean |
Brand Name: | HUINENG |
Minimum passing time: | 1 hour |
Initial setting: | 25 min |
Final setting: | 45 min |
Compressive strenth: | More than 76 Mpa/28days |
Certificate: | ISO9001 |
Means of transportation: | Ocean |
Color: | Grey |
Deliver time: | In one week |
Email: | lovelyfunnyhelen@gmail.com |
Production Capacity: | 1000 tons one month |
Packing: | 25kg/ bag |
Delivery Date: | In one week |
Quick/rapid setting cement material solving concrete crack in driveway
1. Our product
SC cement road repair materials are specifically aimed at solving cement road pavement diseases such as concrete
surface angularity (pitting, hollowing, peeling, roughing,shelling, cracking, exposed stones etc). With strong compressive strength
and bonding strength,when thin layer repair,it won't appear broken and falls off in the condition of high speed and high voltage driving.
2. Application area
1) Highway,national road,provincial road,municipal raod.
2)Concrete surface angulariy( pitting, hollowing, peeling, roughing,shelling, cracking,surface angularity,exposed stones etc)
3)Concrete deep disease(concrete pothole,wide concrete crack)
4)Concrete floor(airport,gas station,warehouse)
3. Our advantages
1)Rapid repair,can open traffic in 1 hour.
2)The initial setting time can finished in 25 min
3)High compressive strength
4)High bonding strength,thin layer patching,no fall off and broken
4.Repair process
5.Technical index
Test items | Unit | Technical requirement | Test result | Individual conclusion | |
Setting time | Initial setting | Min | ≥20 | 25 | Meet requirement |
Final setting | ≤60 | 35 | |||
Compressive strength | 2h | Mpa | ≥20 | 33.0 | Meet requirement |
1d | ≥40 | 66.1 | |||
28d | ≥50 | 90.5 | |||
Pulling strength | 28d | Mpa | ≥2.0 | 2.8 | Meet requirement |
Expansion rate | 28d | / | 0.00%-0.1% | 0.01% | Meet requirement |
6.Package and our factory
7.Our reputation