user login

Quick/rapid setting cement material solving concrete crack in driveway

1000.0~1800.0 USD
Min. Order: 5 Ton
Trade Term: FOB
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 1000 tons one month
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Concrete Repaid Repair Materials, Concrete Driveway Crack Repair Materials, Best Concrete Waterproof Repair Mortar, Best Material For Filling Cracks In Concrete Driveway, Bridge Deck Expansion Joint Repair Solution

Product Detail

Model No.: SC
Means of Transport: Ocean
Brand Name: HUINENG
Minimum passing time: 1 hour
Initial setting: 25 min
Final setting: 45 min
Compressive strenth: More than 76 Mpa/28days
Certificate: ISO9001
Means of transportation: Ocean
Color: Grey
Deliver time: In one week
Email: lovelyfunnyhelen@gmail.com
Production Capacity: 1000 tons one month
Packing: 25kg/ bag
Delivery Date: In one week
Show

Product Description

Quick/rapid setting cement material solving concrete crack in driveway

1. Our product

SC cement road repair materials are specifically aimed at solving cement road pavement diseases such as concrete

surface angularity (pitting, hollowing, peeling, roughing,shelling, cracking, exposed stones etc).  With strong compressive strength 

and bonding strength,when thin layer repair,it won't appear broken and falls off  in the condition of high speed and high voltage driving.

2. Application area

1) Highway,national road,provincial road,municipal raod.

2)Concrete surface angulariy( pitting, hollowing, peeling, roughing,shelling, cracking,surface angularity,exposed stones etc)

3)Concrete deep disease(concrete pothole,wide concrete crack)

4)Concrete floor(airport,gas station,warehouse)

3. Our advantages

1)Rapid repair,can open traffic in 1 hour.

2)The initial setting time can finished in 25 min

3)High compressive strength

4)High bonding strength,thin layer patching,no fall off and broken

4.Repair process

5.Technical index

Test items 

Unit

Technical requirement

Test result 

Individual conclusion

Setting time 

Initial setting

Min

≥20

25

Meet requirement

Final setting 

≤60

35

Compressive strength

2h

Mpa

≥20

33.0

Meet requirement 

1d

≥40

66.1

28d

≥50

90.5

Pulling strength

28d

Mpa

≥2.0

2.8

Meet requirement 

Expansion rate

28d

/

0.00%-0.1%

0.01%

Meet requirement

6.Package and our factory




7.Our reputation

Post Buying Request