user login

How to easily repair broken and exposed reinforcing bar expansion joint

1200.0~2000.0 USD
Min. Order: 5 Short Ton
Trade Term: FOB
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 1000 tons / month
Place of Origin: Henan

Company Profile

Location: Zhengzhou, Henan, China (Mainland)
Business Type: Manufacturer, Trading Company
Main Products: Concrete Repaid Repair Materials, Concrete Driveway Crack Repair Materials, Best Concrete Waterproof Repair Mortar, Best Material For Filling Cracks In Concrete Driveway, Bridge Deck Expansion Joint Repair Solution

Product Detail

Model No.: QM
Means of Transport: Ocean
Brand Name: HUINENG
Usage: Repair concrete expansion joint broken and exposed reinforcing bar
Initial setting: 25mins
Final setting: 35mins
Compressive strength: 33.0Mpa/ 2 hours
Pulling strength: 2.8Mpa
Expansion rate: 0.01%
Open traffic time: 2 hour
Color: Grey
Certificate: ISO9001
Inspection report: MSDS
Production Capacity: 1000 tons / month
Packing: 25KG/Bag
Delivery Date: in one week
Show

Product Description

How to easily repair broken and exposed reinforcing bar expansion joint?


How to easily repair broken & exposed reinforcing bar expansion joint?

--- Henan Huineng QM type concrete repair material help you!


Original damage: Broken & Exposed reinforcing bar

After repaired:

QM type repair material is developed by Henan Huineng Road And Bridge Technology

Co.,Ltd. It is rapid repair material for Highways,National roads,Provincial roads, Municipal 

bridge deck and bridge expansion joint cracks.we have core technology in repairing Bridge 

deck cracks, Potholes, Expansion joint cracks. Achieved 1-2h rapid open traffic. 


Advantage:

This material is of simple construction, high strength, good toughness,strong adhesion, 

waterproof anti-freeze, seamless with original concrete, small color difference with original, 

No broken and fell off under high speed and high voltage driving


Technical data:

Test items 

Unit

Technical requirement

Test result 

Individual conclusion

Setting time

Initial setting

Min

≥20

25

Meet requirement

Final setting 

≤60

35

Compressive strength

2h

Mpa

≥20

33.0

Meet requirement

1d

≥40

66.1

28d

≥50

90.5

Flexural strength

2h


     ≥4

5.5

Meet requirement

1d

     ≥6

    10.5

28d

     ≥8

13.5

Pulling strength

28d

Mpa

     ≥2.0

2.8

Meet requirement

Expansion rate

28d

 /

0.00%-0.1%

0.01%

Meet requirement


Repair process:


Package and Storage:

1.Package: Paper plastic composite bag packaging, 40kg/bag.

2.Storage: Stored in dry and cool place,rain-proof, water-proof.

3.Storage period: 9 months







Post Buying Request