Min. Order: | 5 Ton |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, D/P, D/A, T/T, WU |
Supply Ability: | 2000 tons one month |
Place of Origin: | Henan |
Location: | Zhengzhou, Henan, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Concrete Repaid Repair Materials, Concrete Driveway Crack Repair Materials, Best Concrete Waterproof Repair Mortar, Best Material For Filling Cracks In Concrete Driveway, Bridge Deck Expansion Joint Repair Solution |
Model No.: | BC |
---|---|
Means of Transport: | Ocean |
Brand Name: | HUINENG |
Minimum passing time: | 2-4 hours |
Initial setting: | 25 min |
Final setting: | 35 min |
Compression performance: | 63 Mpa/1 day |
Certificate: | ISO9001 |
Color: | Grey |
Dliver time: | In one week |
Means of transportation: | Ocean |
Email: | lovelyfunnyhelen@gmail.com |
Production Capacity: | 2000 tons one month |
Packing: | 25kg/ bag |
Delivery Date: | In one week |
How to repair concrete surface fracture
One. Product introduction
BC-type concrete pavement patching material is ideal material for a professional to solve concrete pavement surface disease.
Especially aiming at solving road surface dusting, peeling, exposed stone etc diseases.
Two.Scope of application
Airport runways, highway, road, municipal, tunnels, bridges, concrete floor.
Three.The 8 big Advantage of our product
1. Repair fast, the traffic can be opend in 2-4 hours.
2. Easy operation.
3.High bond strength.
4. High compressive strength.
5. Antifreeze.
6. Salt corrosion resistance.
7.Wear-proof .
8.Small color difference
Four.Testing result
Test items | Unit | Technical requirement | Test result | Individual conclusion | |
Setting time | Initial setting | Min | ≥15 | 25 | Meet requirement |
Final setting | ≤60 | 35 | |||
Compressive strength | 2h | Mpa | ≥20 | 32 | Meet requirement |
1d | ≥30 | 63 | |||
28d | ≥50 | 95 | |||
Pulling strength | 28d | Mpa | ≥1.0 | 2.8 | Meet requirement |
Expansion rate | 28d | / | 0.0%-0.1% | 0.02% | Meet requirement |
Five.Construction process:
Identifying→Cleaning→Washing→Wetting→Cleaning→Adding water→Mixing→Paving→Curing
Six. Our company and factory
Henan Huineng Road and Bridge Technology Co.,Ltd. is using Modern Road Construction Technologies to solve an age old problem. Building a better, stronger and more cost effective road.
Our purpose is to create best solutions for a worldwide road construction industry.