Place of Origin: | Zhejiang |
---|
Location: | Guangzhou, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Precision Machined Parts |
Model No.: | HSJ-S011 |
---|
High Precision Iron Die Casting Parts with E-coating / Dacromet
Business Flow:
Clients’ sample or 2D/3D drawings
→Our engineering department
→Clients’ requirements and details
→Sample production
→Clients receive samples
→ Clients checked and approved
→Mass production
→Delivery products
Applications:
CNC machining part Applications: |
||||
·Cars |
·Nameplates |
· Games |
·Robots |
·Bikes |
·Electronic devices |
·Jewelry |
·Aircraft |
·Enclosures |
·Jigs |
·Sound equipment |
·Musical instruments |
·Clocks |
·Telecom |
·Sporting |
·equipment |
·Watercraft |
·Machinery |
·Lighting |
·Tooling |
·Optical devices |
·Engines |
·Medical devices |
·Toys |
·Sensors |
·furniture |
·photographic devices |
·Models |
·and more |
|
Drawing, photos and samples are welcomes |
Packing & Delivery
1, Packing:
We can provide normal free plastic film, and carton box;
While customized label and carton with your LOGO are also available.
2, Delivery:
After confirming order, samples about 2-3 weeks, mass production about 4-6 weeks according to your requirements and production quantity of products.
FAQ:
(1). Question---Are you the trading company or factory?
Answer-----We have our own factory!
(2). Question---What`s the production capacity for your company?
Answer---Normally can reach 20, 0000 pieces annual.
(3). Question---How about the delivery time?
Answer---The delivery time will according to the part quantity, usually sample will
need 7-10 days, and part production will need 25-30 days!
(4). Question---What`s the Scrap rate for the part?
Answer---Normally, the scrap rate is 3%~4%.However,we won't send you any scrap part,
all the part will be 100% inspected by our quality department to make sure no available ones.
(5). Question---What we should do if we check out the part problem?
Answer---If you have received any unqualified part, please show us the pictures, after our
engineers and QC department check ,we will choose to help you repair or redo within
10~15 days according to rejected quantities.