user login

Customized design kitchen crema marfil countertop with high quality

60.0~120.0 USD
Min. Order: 100 Square Meter
Trade Term: FOB
Payment Terms: L/C, T/T, WU
Supply Ability: 5000m2
Place of Origin: Fujian

Company Profile

Location: Quanzhou, Fujian, China (Mainland)
Business Type: Manufacturer
Main Products: Granite Slate Marble Travertine Marble Tiles Pebble Countertop Vanity Top

Product Detail

Means of Transport: Ocean, Air, Land
Technics: Natural
Surface Finishing: Polished
Color: Black
Brand Name: mycare stone
color: white
material: natural granite stone
surface finishing: polished,honed
item: New arrival black countertop
crema marfil countertop: polished crema marfil vanity top
payment: T/T,L/C
usage: home decorative countertop
granite kitchen bathroom countertop: crema marfil bathroom countertop
packing: wooden crate
product name: New arrival beige countertop for hotel
Production Capacity: 5000m2
Packing: wooden crate
Delivery Date: 15-25days
Show

Product Description

Customized design kitchen crema marfil countertop with high quality


Name Customized design kitchen crema marfil countertop with high quality
Materialgranite or marble.onxy, sandstone,travertine
 Popular Color black, white , green , red, pink,etc.
Surface Finish 

Polished, honed, flamed, rough picked, bush-hammered, sandblasted, engraving, chiseled etc.

Edgefull bullnose,half bullnose,flate eased,bevel top, etc

 

Size

countertop siz

 84'' x 26'',96'' x 26'', 108'' x 26'', 100'' x 36.5'', 84'' x 36'', 72'' x 48

vanity top size

25'' x 19''/22'', 31'' x 19''/22'',37'' x 19''/22'', 49''x19''/22'', 61'' x 19''/22''(Single or Double sinks)

or customer's requirement

Packingwooden crate for   Customized design kitchen crema marfil countertop with high quality
 Quality Control

 

 

1) Polished degree: 85 or up;

2) Thickness tolerance: +/- 2mm;

3) Diagonal tolerance : +/-1mm;

4) Surface flatness tolerance: +/-0.3mm;

5) Adjacent edge verticality tolerance: +/-0.5mm, Precise cutting by infrared-ray-cut machine.

 

Delivery Time

1) Delivery time: 15~20 days after the order confirmed.

 

2) Shipping port:  Xiamen Port, or as client's requirement


Post Buying Request