user login

High Voltage Oil immersed Power Transformers 500kV Kema Certificate

100.0~100000.0 USD
Min. Order: 1 Piece/Pieces
Payment Terms: L/C, T/T
Supply Ability: 6000PCS
Place of Origin: Zhejiang

Company Profile

Location: Ningbo, Zhejiang, China (Mainland)
Business Type: Manufacturer
Main Products: Wind Power Generation Combined Substation, American Type Pad Mounted Substation, High Impedance Furnace Transformer, 50MVA 115KV Power Transformer

Product Detail

Model No.: 400MVA 220KV
Means of Transport: Ocean
Brand Name: sinopower
400MVA 230KV Power Transformer: Auto Transformer
OSFZ-400000/230: Power transformer
MR Tap-changer: Nynas OIL Transformer Insulation Oil
Production Capacity: 6000PCS
Packing: Naked Packing
Delivery Date: 6 months
Show

Product Description

Technical  Descripition

 

500kV and Up  Oil-immersed Transformer         

High Voltage Oil immersed Power  Transformers 500kV Kema  CertificateHigh Voltage Oil immersed Power  Transformers 500kV Kema  Certificate

High Voltage Oil immersed Power  Transformers 500kV Kema  CertificateHigh Voltage Oil immersed Power  Transformers 500kV Kema  Certificate

 

Based upon world-wide advanced technology and also incorporates the experiences of internationally leading transformer companies as well as our own long-term experience. Through innovation and optimization, low loss, low noise, low partial discharge and high short circuit withstand capability are achieved in our 69kV and up oil-immersed transformer series., the carefully made SINOPOWER 69kV and up oil-immersed transformer series, being energy saving and environmentally friendly, shall conform entirely with up-to-date specified standards according to customer's specification, and are proud of the following outstanding features:

 

1.   Low Loss and Low Noise

The core laminations are composed of imported high quality grain-oriented cold-rolled silicon steel sheets with chamfered joints and the joints are step-lapped with 5 steps, thus ensuring low loss and low noise. The inside of the tank is lined with magnetic and /or copper shields. Measures have been taken for metallic structural parts located in high magnetic field, to reduce stray loss and thereby the total load loss, and to relieve local overhearing.

After stacking, the core are pressed integrally and finally glued together by epoxy resin on the cut edges, so that the three limbs and the upper and lower yokes are bonded together into a rigid, vertically straightened entity, together with the plate-type upper and lower frame. That can reduce the noise effectively against vibration from core.

 

2.   Safe and Reliable Service

Reliability is the everlasting objective of SINOPOWER. Partial discharge of finished products are constantly kept below 50pC, ensuring that the transformers can be  operated under long service voltage and occasional over-voltage without trouble. Low current density in winding conductor and appropriate cooling arrangement ensure that the winding temperature rise and top oil temperature rise are lower than that specified standards and that the mechanical stress in winding conductor during short circuit does not exceed certain safe limit. Together with technological procedures during manufacture and other means to elevate mechanical strength, SINOPOWER transformers can withstand severe short circuit in all cases during service.

 

3.   Easy Erection and Maintenance

To minimize erection work at jobsite, SINOPOWER transformers are so fabricated that lifting the active part out of the tank for inspection after arrival at site is not mandatory. Besides, all components to be mounted on the transformer at site have been pre-assembled before dispatch, and all secondary rings have been laid down into conduits on the transformer and connected to the terminals in the control cabinet or terminal box. Little maintenance work is required for the cooling devices.

 

4.   Careful Fabrication

Vertical winding machines with tension device are used for HV winding, so that the windings can be wound more tightly and therefore mechanically strength as a whole. All insulation parts subjected to mechanical stress during short circuit, such as spacers in windings are made with T4 densified  pressboard to reduce shrinkage. Drying process for the windings are carried out twice, once for the individual windings, and again for the assembled phase block. After core and coil assembly, an additional vapor phase drying (VPD) is once more carried out to ensure that all insulation parts are thoroughly dried and no further shrinkage is possible to occur during service.

All the high voltage terminals and nearby metallic structural parts are rounded up to prevent partial discharge. High voltage bushing terminals are contained within turrets, and kept concentric with the turret. All the leads are properly crimped and metallized to be rounded up. VPD process insures that the moisture content within the transformer is kept at a very low level, and the core and coil assembly is once more cleaned by condensed vapor flowing down the surfaces.

The fabricated tanks are relieved from welding stress and shot-blasted integrally, so as to be free from oil leakage trouble and to give the tank a clean, pleasant looking appearance. High quality paint is applied as surface finish of the tank and exposed steel parts.

 

5.   Clean Work Environment

The winding manufacture, winding assembly and core and winding assembly work are all proceeded in totally closed clean shops. The cleanliness and temperature stability requirement of the area are the same as that required for the manufacture of 500kV class transformers. Even metallic particles on the crane's tracks are cleaned up by magnet.

 

6.   Quality Assurance 

Quality assurance rules are observed from the very being of acquisition of raw materials and components. No rusting, colliding, scratching or hammering are allowed for steel plate. Special attention is paid to those parts susceptible to oil leakage. All the gasket groove surfaces are carefully machined, and limits are provided to prevent the gasket material from being compressed over its elastic limit. The transformer tank is integrally shot-blasted, and burrs and welding slags are thoroughly removed. Radiators and other component parts are tested in accordance with their respective service condition. Usually the upper and lower parts of the tank are bolted together with double gasket grooves in their jointing surface and kept tight with high quality gasket material, effectively preventing oil leakage from the jointing surface. If required by the customer, the upper and lower part of the tank can also be welded oil tight.

Quality assurance rules are also observed for all insulating parts, from raw material to final assembly. Strict regulations are observed for drying, wrapping and storage, preventing the absorption of moisture, swelling, and deformation. Finished spacers and pressure rings are all stored in practically isothermal oven. Finished windings, after pressing and adjustment are conserved in specially made isothermal cylinders. For the core and coil assembly, the time interval between lifting out from oven and tanking is strictly controlled, so that no significant absorption of moisture can occur due to exposure.

7.   Main components

7.1   Because of good relationship and long-term co-corporation with all well-known sub-suppliers, SINOPOWER can meet the requirements of customers with whatever types of components they wish to have.

7.2   Our own patented low noise fan is an assurance that forced-air cooled transformers can be made with noise level even lower than 62 dB.

7.3  Flat plate type radiators, developed and produced by SINOPOWER itself are highly efficient, better quality and best delivery time, and are also being supplied to other transformer manufactures in world.


Force Analyse                                          Three-dimensional Drawing

 

 

 

 

 


 

Workshop                                                         Testing Hall


Post Buying Request