Min. Order: | 500 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, T/T, WU |
Supply Ability: | 10000 |
Place of Origin: | Zhejiang |
Location: | Ningbo, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Agent, Service |
Model No.: | Y01-WE403 |
---|---|
Means of Transport: | Ocean, Air, Land |
Brand Name: | YL |
Structure: | Angle |
Material: | Brass |
Power: | Manual |
Standard or Nonstandard: | Standard |
Application: | Floor |
Production Capacity: | 10000 |
Packing: | Carton |
Delivery Date: | 45 days |
Plumbing fitting:11/2" Shower Waste 31/4" Tail
Brand name:YL
Specification:
Product details:
Showing room:
Production line:
Delivery:
Quality certification:
Our Features:
Skilled, experienced and certified machinists
Consistent quality from first part to last in a production run
Much Competitive price based on efficient process and cheap labour cost in China
Capabilities to design or modify parts to customers prints
Pay close attention to the details of your product needs and respond quickly to your requests
Our value:
Act with uncompromising honesty and integrity in everything we do
Satisfy our customers with custom innovation, superior quality,service and cost-cutting.
Value and develop our employees' diverse talents, initiative and leadship
Equipment Maintain:
Machining equipments maintain: Checked by each day, have records to track
Inspection equipment maintain: Checked by each 15 days, have records to track.
Material Supply:
To be sure material specification and size correct, to be sure material chemical composition correct, matercial certification must be provided in each material purchasing lot.
Production process:
Setup work instruction chart for each part,check production process and updated drawing issue before machining
Fixed Inspection: 4 times/shift, have records to check, carried by QC
Random Inspection: to avoid uncertain potential quality issues, final Inspection: Each part have its final inspection stardard before packing, have inspection sheet to track
Packing and Assembly:
To Meet Custom requirments, including labels, cartons, pallets etc before shipment.