Place of Origin: | Zhejiang |
---|
Location: | Qingdao, Shandong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Tyre Mould, Tire Mould, Tyre Mold |
Steel 11 x 4.00 - 6 ATV Tyre Mould With EDM Process For Bicycle / Motorcycle
Specifictions:
Name |
Tire mold |
Main business |
tyre mould for bicycle, motorcycle, solid, AG OTR ATV LT |
Mterial |
steel |
Brand |
Delite |
Supply ability |
150 sets a month |
Exported |
all the world |
Equipment |
we have cutting machine welding machine polishing machine milling machine grinding machine drilling machine lathe CNC edm |
Certificate |
ISO9001:2008 |
Processing |
we could according to your sample/drawing/material produce |
Inspection |
we could according to the requirement of you test |
Other advantages |
we have more than 10 years experience in producing the tire mould |
Contacts |
Qingdao Delite precision mould CO, LTD,. |
Factory information:
Qingdao Delite Precision Mould Co., Ltd is a professional company which is focusing on the research and design of kinds of tire mold. Our company was founded in 1999, which is occupies 10000 square meter, our company has introduced many technician high level of this industry and we established a complete process to the mold production. We adopt the computer controls the automatic electricity and the digital processing equipment to make sure of the quality. And the company has passed the ISO9001-2008 international quality management system certification. The quality of our mold has been inspected and proved by many famous tire factories in China and other countries. Until now, our products have been exported to many countries, such as United States, India, Sri Lanka, southeast Asia, Germany, Japan, South Korea, Brazil, and other countries and regions.
Our advantages:
We can supply the tire mold for bicycle tire, motorcycle tire,solid tire,ATV tire,etc.
2. Design ability
Our excellent engineers have ability to develop and design the mould drawing by tyre sample or tyre drawings.
3. Quality control
Process--- We adopt one-time EDM process and CNC machining to guarantee the high precision of the mold
Material-- Material adopts Forging steel to guarantee the quality of the mold.
Inspection-- Inspection in each procedure and 100% final inspection as drawings strictly before shipment to guarantee the high quality
4. Fast delivery
We will control our production lead time,it takes 45~50 days to finish the work.And will not delay to your hand.
If some customers have no