user login

Automatic Transformer Manufacturing Machinery , PLC Control Corrugated Fin Welding Machine

Place of Origin: Zhejiang

Company Profile

Location: Guangzhou, Guangdong, China (Mainland)
Business Type: Manufacturer
Main Products: Roof Panel Roll Forming Machine, Steel Tile Forming Machine, Double Layer Roll Forming Machine

Product Detail

Model No.: W1300x400

Product Description

Automatic Transformer Manufacturing Machinery , PLC Control Corrugated Fin Welding Machine

 

 

 

Product Description

Corrugated Fin Forming Machine for making transformer tank

Used for making fin radiator for transformer corrugated tank.

 
Main technical paramter

1. width of raw steel coil: 300-1300mm


2. steel thickness 1-1.5mm


3. fin height 100-400mm


4. fin distance: 45-80mm


5. decoiler: mechanical expansion, capacity 5 tons


6. hydraulic station, 35-30MPA


7. PLC control system Mitsubishi brand


8. working speed: 3 fins/min


9. forming machine size: 5.5m x 1.6m x 2.2m

Working flow of the machine

uncoiling -- coil feeding -- plate folding -- cutting -- run-out

 

Fin pitch and fin height should be manually adjusted limit switches. Fin quantity can be preset in the PLC.

 

Main components of transformer corrugated fin machine

 

1. Decoiler: mechanical expansion, passive, capacity 5T.

 

2. Hydraulic station: max. pressure 21MPa, max. flux 40L/min, pump motor 15kW; main hydraulic components are from Taiwan.

 

3. Main forming unit: hydraulic driven, automatic forming.

 

4. Shearing device: hydraulic driven to cut formed fins.

 

5. Run-out table: manual, 1.5m long.

 

6. PLC control system: PLC is SIEMENS, touch screen, electric components are Schneider brand

 

 

 
Packaging & Shipping

  

Seaworthy export standard packing for the machine. All machine parts are well fastened and fixed by blocks and wire ropes. Normally one machine needs one 20 feet container for shipping.

 
Our Services

We can provide you not only good quality transformer corrugated tank machines but also good after-sale service.   

 
FAQ

 

1. Machine installation & commissioning, training:

1 technician will be dispatched to Buyer’s plant for installation & commissioning. Work period: in 5 days

The expense of round trip tickets, accommodation, safety and interpretation shall be covered by Buyer, additional pay allowance to the technicians.

2. Warranty: one year

3. Price basis: FOB or CNF or CIF

 

 

 

Post Buying Request