Min. Order: | 1000 Piece/Pieces |
---|---|
Trade Term: | FOB |
Payment Terms: | L/C, PayPal, D/P, T/T, WU |
Supply Ability: | 30,000 pieces/month |
Place of Origin: | Zhejiang |
Location: | Hangzhou, Zhejiang, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company |
Main Products: | Hardcover Book, Brochure, Catalog, Softcover Book, Magazine |
Means of Transport: | Express, Ocean, Air, Land |
---|---|
Type: | Others |
Brand Name: | Xiandai |
Color: | Four color |
Material: | Uncoated paper+greyboard |
Shape: | Irregular |
Board: | Meeting notification board |
Die cutting: | Irregular shape |
Hole: | Two holes |
Stamping: | None |
Brand: | MOFAN |
Surface finishing: | Die cutting&debossing |
Purpose: | Schedule notice |
Printing: | Offset printing |
Production Capacity: | 30,000 pieces/month |
Packing: | Carton |
Delivery Date: | 5-7 days |
This meeting board is used for new product presentation.It requires complex die cutting work.The schedule of new product presentation is printed on the back of meeting board.
The content of schedule contains presentation date, item, address and order sequence, etc.
1.We can design and print all kinds of meeting boards.
2.The printing of meeting board must be performed with precision to ensure quality.
3.We print such meeting board in pleasant look and feel.
4.The board can have logos and information printed as per client's requests.
5. Whole-set meeting board design and printing services at one stop.
Materials | kraft paper+greyboard |
Surface Finishing | Sticking&die cutting |
Meeting board | Irregular shape |
Design | Presentation meeting board |
Front of meeting board:
Back of meeting board:
Die cutting of board:
Board printing:
Color control procedures:
The color of our digital sample is 95% similar to that of printed sample on Heidelberg printer. They are put in our strict color management system. We can supply a whole set of digital printing sample for your reference. Of course, you can see its final binding effects after receiving this digital sample. It can be finished within three days.
We ensure the color consistency through our advanced Koda CTP system and strict color management procedures from pre-press to printing on the printer.
Quality control flowchart:
We have implemented strict 6S manufacturing system and ISO9001 quality assurance system. There are 12 QC inspectors and engineers, and all the products have to be inspected before leaving the factory (100% inspected).