Min. Order: | 1 Piece/Pieces |
---|---|
Payment Terms: | Paypal, L/C, T/T, WU |
Supply Ability: | 10000 |
Place of Origin: | Guangdong |
Location: | Shenzhen, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer, Trading Company, Service |
Main Products: | LED Lighting, LED Downlight Kit, LED Spotlight, LED Bulb, LED Panel Light |
Model No.: | GOIN-DL13W |
---|---|
Means of Transport: | Ocean, Air, DHL/FEDEX/TNT, Land |
Brand Name: | GOINLED |
POWER: | 13W |
INPUT VOLTAGE: | 220V |
LED BRAND: | SAMSUNG/LG 5630 |
PF: | >0.9 |
Production Capacity: | 10000 |
Packing: | Nature box |
Delivery Date: | 2-7 for samples, official order depond on QTY |
Specification
Item Model | GOIN-DL13W |
Wattage | 13W (10W 12w available) |
Lumens | 1100lm |
CRI | >83 |
PF | 0.92 |
LED Chip | Samsung/LG SMD5630 |
Color temperature | 2700k-7000k |
Voltage | AC100-240V; AC85-265V Available |
Size | Recessed:110mm*42mm Cutout:90mm( H32mm Flat surface) |
Housing color | White/Silver/black/Satin Nickel/Satin Chrome |
Driver | SAA/EMC Approvel external contant current; can work at 260V for long time |
Dimmable | Yes, work with most leading edge, trailing edge&Universal+Clipsal,HPM,C-bus |
Dimming range | 3%-100% |
Thermal type | Die-casting aluminium |
Lens | Frosted, with no spot |
Beam angle | 90° |
Adjustable | No |
IP rating | IP44, Mist proof |
Certificates | SAA/C-tick/CE/RoHS(LCP/TM21/LM79/LM80 test report passed) |
Application | Shop mall, Hotel, Office, Bar,Showroom, Villa lighting, Bath room, home etc |
Packing info | Carton size: 48*36*33cm 36pcs/Carton 17.5kg/Carton |
Net weight | 0.45kg |
Warranty | 3 years |
Lead time | 10-12 days |
Payment terms | LC/TT/West Union/Paypal |
Original place | Made in China |
Products size:
Why choose us?
1, Professional solution provided by expert engineers
2, Reliable quality
3, Competitive prices on the market
4, Quick delivery time
5, OEM,customization available
6, Good after-sale service
7, Full range of tests and certificates are covered for different markets
Cautions
1.Swith off the power before replacing lamp
2 Power supply should be adapted to the right voltage before installation .
3.Keep away from direct sunshine and high temperature.
4 If any doubt about installation or use of this products consult competent electrical.
Our Services
Warranty Term:
1. Under the terms of this warranty, if the product have a failure occurs under normal usage within warranty period,we will provide free/rework new products.
2. If Failure or damage due to incorrect operation, wire connection, or anything other do not follow our instuction,we will provide paid maintance within warranty period.
Trade Terms:
1. Payment term: T/T 100% payment in advance, or for over 10,000USD, TT 30% deposit after order confirmed, the balance
after goods ready before shipping. or L/C, or Western Union for small amount.
2. Lead time: normally in 5~10 days after deposit received
3. Sample policy: Samples are always availble for each model . Samples can be ready in 3~7 days once payment received.
4. Shipping port: Shenzhen, China
5. Discounts: We offer discount for big quantity.