user login

Carbon Steel Barred Tee

0.01 USD
Min. Order: 1 Piece/Pieces
Trade Term: FOB,CFR,CIF,DAT,FAS,DDP,DAP,CIP,CPT,FCA,EXW
Payment Terms: L/C, D/P, D/A, T/T, WU
Supply Ability: 50000TONS/YEAR
Place of Origin: Hebei

Company Profile

Location: Cangzhou, Hebei, China (Mainland)
Business Type: Manufacturer
Main Products: Fittings, Pipes And Tubes, Flanges

Product Detail

Means of Transport: Ocean, Air, Land
Technics: Forged
Type: Tee
Material: Carbon Steel
Brand Name: HH
Material: CARBON STEEL,ALLOY STEEL,STAINLESS STEEL
Place of Origin: Hebei China (Mainland)
Connection: BUTT WELDING
Size: 1/2"-96"
End: Bevel end
Technics: Forged
color: black
Inspection: Accept TPI
Certificate: ABS,API,ISO,BV,SGS
kind: welded and seamless
Production Capacity: 50000TONS/YEAR
Packing: WOODEN CASE
Delivery Date: 7DAYS
Show

Product Description

Barred Carbon Steel Tee

Type

Tee

Size

Seamless tee:1/2"~24" DN15~DN600
Welded tee: 1/2"~100" DN15~DN2500

Wall thickness

sch10, sch20, sch30, std, sch40, sch60, xs, sch80, sch100, 
sch120, sch140, sch160, xxs, std,sch5s, sch20s, sch40s, sch80s

Standards

ASME B16.9-2007 
ASME B16.25-2007
ASME B16.5-2007
EN10253-1-1999 EN10253-2-2007 EN10253-3-2008 EN10253-4-2008
DIN2605-1-1992 DIN2605-2-1995
JIS B2311-2009 JIS B2312-2009 JIS B2313-2009
GB/T12459-2005 GB/T13401-2005 GB/T10752-2005 
SH/T3408-1996 SH/T3409-1996
SY/T0609-2006 SY/T0518-2002 SY/T0510-1998 
DL/T695-1999 GD2000 GD87-1101
HG/T21635-1987 HG/T21631-1990 

Material

Carbon steel: ASTM/ASME A234 WPB,WPC
Alloy steel: ASTM/ASME A234 WP 1-WP 12-WP 11-WP 22-WP 5-WP 91-WP 911 
Stainless steel: ASTM/ASME A403 WP 304-304L-304H-304LN-304N 
ASTM/ASME A403 WP 316-316L-316H-316LN-316N-316Ti 
ASTM/ASME A403 WP 321-321H ASTM/ASME A403 WP 347-347H
Low-temperature steel: ASTM/ASME A402 WPL 3-WPL 6
High performance: ASTM/ASME A860 WPHY 42-46-52-60-65-70

Surface treatment

Transparent oil, rust-proof black oil or hot galvanized

Packing

wooden case, pallet or as customers' requirement

Applications

Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc

Min order

1 piece

Delivery time

7 after receipt of advanced payment

Certification

API, CCS, and ISO9001:2008

Delivery Term

FOB(30% down payment in advance, the balance before shipment)

CIF or C&F(30% in advance , the balance against with the copy of B/L)

  Our staff of sales and technical support is available to help you in selecting the right protection for your application as well as to provide you with samples of our products for evaluation. At HAIHAO,we are committed to providing the highest level of customer service, competitive pricing, speedy delivery and a comprehensive, cutting-edge product offering. Our ultimate goal is your satisfaction

Post Buying Request