Place of Origin: | Zhejiang |
---|
Location: | Guangzhou, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Aluminum Navy Chairs, EMECO Navy Chairs, Metal Navy Chair |
Model No.: | TW1007 |
---|
Durable Construction Stackable Aluminum Navy Chairs In Dining Chairs
Quick Detail:
Type | Dining Room Furniture | Specific Use | Dining room |
Material | Metal | Metal Type | Aluminum |
Size | W52*D51*H46/83CM | Finishing | Anodizing Brushed |
Description:
1.Durable construction
2.Matching bar and counter stools
3.Suitable for outdoor use
Applications:
A basic side chair? Hardly. The design and construction of the Café Chair is as classic as it is indestructible. Light weight and easy to move around, you’re sitting pretty everywhere. Indoor/outdoor, Fully assembled, Available in counter and bar height
Specifications:
Model No. |
TW1007 |
Material |
Aluminum |
Product Size |
D51*W52*H46/83cm |
Finish |
Anodizing Brushed |
Structure |
Welding |
Packing |
4pcs/ctn, 68*55*104cm |
Loading Qty |
288pcs/20'GP, 576pcs/40'GP |
Port |
Guangzhou Or Shenzhen |
The classic aluminum chair has been in continuous production since the mid 1940's by Emeco. Based on a marriage of style and a time honored proprietary 77 step process, Emeco can be considered the guardian of a lost art...the manufacture of something enduring and endearing. Three times stronger than steel and amazingly lightweight, these chairs have a life expectancy of at least 150 years. Timeless. Chairs admired today - and indefinitely. Chairs that span generations and cultures.
Customer service:
1. Minimum order quantity
Normally, minimum order quantity is around 50-150pcs, depends on the products
2. Shipment service
We can help and recommend a reliable shipping forwarder to ship the goods to the destination port.
However, if you have a good shipping agent, we can also use yours.
3. Price terms
FOB Shenzhen/Guangzhou port for full container load orders; EX work price for less container loaded orders.
4. Products warranty
We provide 1 year products warranty for all Tuwell furniture.
5. Production lead time
One 20ft container 20-25 days One 40ft or 40'HC container will be 25-30 days.
Less container loaded (LCL) products same production time as one 20 ft container.
(noted: if one container mix items, please give us 1 week more for production )