Place of Origin: | Zhejiang |
---|
Location: | Guangzhou, Guangdong, China (Mainland) |
---|---|
Business Type: | Manufacturer |
Main Products: | Aluminum Navy Chairs, EMECO Navy Chairs, Metal Navy Chair |
Model No.: | TW1006 |
---|
Restaurant Metal Armless Aluminum Navy Chairs With Plastic Non-marketing Feet
Quick Detail:
Type | Dining Room Furniture | Specific Use | Dining room |
Material | Metal | Metal Type | Aluminum |
Size | W40*D52*H46/84CM | Finishing | Anodizing Brushed |
Description:
1. Modern dining chair
2.Hollow brushed aluminum
3.Different colors available
4.Plastic non-marketing feet
5.No assembly required
6.Suitable for outdoor use
Applications:
Office Designs carries only top-tier, ergonomic products which are always created by world class designers
Specifications:
Model No. |
TW1006 |
Material |
Aluminum |
Product Size |
D52*W40*H46/84cm |
Finish |
Anodizing Brushed |
Structure |
Welding |
Packing |
2 pcs/ctn, 63*41*93cm |
Loading Qty |
240pcs/20'GP, 484pcs/40'GP, 550pcs/40'HQ |
Port |
Guangzhou Or Shenzhen |
First built for use on submarines in 1944, the Navy Chair has been in continuous production ever since. With the famous 77 step Process, our craftsmen take soft, recycled aluminum, hand form and weld it- then temper it for strength. Finally, the chair is anodized for a durable finish
Customer service:
1. Minimum order quantity
Normally, minimum order quantity is around 50-150pcs, depends on the products
2. Shipment service
We can help and recommend a reliable shipping forwarder to ship the goods to the destination port. However, if you have a good shipping agent, we can also use yours.
3. Price terms
FOB Shenzhen/Guangzhou port for full container load orders; EX work price for less container loaded orders.
4. Products warranty
We provide 1 year products warranty for all Tuwell furniture.
5. Production lead time
One 20ft container 20-25 days One 40ft or 40'HC container will be 25-30 days.
Less container loaded (LCL) products same production time as one 20 ft container.
(noted: if one container mix items, please give us 1 week more for production )