user login

YAKE Cabinet air conditioners

100.0~500.0 USD
Min. Order: 5 Set/Sets
Trade Term: FOB
Payment Terms: L/C, T/T
Supply Ability: 5000sets
Place of Origin: Guangdong

Company Profile

Location: Foshan, Guangdong, China (Mainland)
Business Type: Manufacturer
Main Products: Industrial Air Conditioner, Industrial Heat Exchange, Cabinet Air Conditioner, Enclosure Air Conditioner

Product Detail

Model No.: KJH-15Q
Type: Cabinet Air Conditioner
Certification: CE
Brand Name: YAKE
cooling capacity: 1500W: rated voltage:220V/50Hz
Production Capacity: 5000sets
Packing: foam inside, carton outside
Delivery Date: 25 days after receive deposit or L/C
Show

Product Description

Application

 

1. CNC system electric control cabinet, power supply cabinet for electrical process machine tool

 

2. Operation cabinet of heavey machinery

 

3. Telecom, Commuication and progran control exchanger

 

4. All kinds of Measuring Instrument

 

 

Features

 

1. Fully closed air circle system, prevent the dust, gas fog and humid air entering into the control cabine

 

2. Suitiable for electric control cabinets which do not have very strict demand on working temperature

 

3. Working temperature is higher than air dew point ad it has a good environment temperatrure adapability

 

 

Remarks

 

1. The installation place should be capable to stand its weight and transfering force when working

 

2. Prohibit jams at the intake, ensure te distance between the in-outlet and deterence is over one meter, the unit ventilation shouldb be good, otherwise, it will influence the cooling effect and may lead to breakdowm

 

3. The unit should be installed at the place with a good airflow, it is forbiden to have dangerous, flammable and explodable products around them

 

4. The inlet filter must be cleaned once a week, othervise, it will influence the cooling effect and may lead to breakdown

 

5. Dring operating, it should stop working for settlement when something wrong appears, it is not allowed to continue workingwith malfunction.

 

6. Avoid direct sun shining and keee away from heat source

 

7. Be aware of place the water discharge pipe

 

8. After the first one-month operation, you should check carefully every links and tighten parts, it should not be loosed, damaged and so on, only neutral scour can be used t clean the surface of the unti.


Post Buying Request